• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

Texas Instruments Breaks Ground on New 300-mm Semiconductor Wafer Fabrication Plant in Utah

TheLostSwede

News Editor
Joined
Nov 11, 2004
Messages
16,189 (2.27/day)
Location
Sweden
System Name Overlord Mk MLI
Processor AMD Ryzen 7 7800X3D
Motherboard Gigabyte X670E Aorus Master
Cooling Noctua NH-D15 SE with offsets
Memory 32GB Team T-Create Expert DDR5 6000 MHz @ CL30-34-34-68
Video Card(s) Gainward GeForce RTX 4080 Phantom GS
Storage 1TB Solidigm P44 Pro, 2 TB Corsair MP600 Pro, 2TB Kingston KC3000
Display(s) Acer XV272K LVbmiipruzx 4K@160Hz
Case Fractal Design Torrent Compact
Audio Device(s) Corsair Virtuoso SE
Power Supply be quiet! Pure Power 12 M 850 W
Mouse Logitech G502 Lightspeed
Keyboard Corsair K70 Max
Software Windows 10 Pro
Benchmark Scores https://valid.x86.fr/yfsd9w
Texas Instruments (TI) today broke ground on its new 300-mm semiconductor wafer fabrication plant (or "fab") in Lehi, Utah. Joined by Utah Governor Spencer Cox, state and local elected officials, as well as community leaders, TI President and Chief Executive Officer Haviv Ilan celebrated the first steps toward construction of the new fab, LFAB2, which will connect to the company's existing 300-mm wafer fab in Lehi. Once completed, TI's two Utah fabs will manufacture tens of millions of analog and embedded processing chips every day at full production.

"Today we take an important step in our company's journey to expand our manufacturing footprint in Utah. This new fab is part of our long-term, 300-mm manufacturing roadmap to build the capacity our customers will need for decades to come," said Ilan. "At TI, our passion is to create a better world by making electronics more affordable through semiconductors. We are proud to be a growing member of the Utah community, and to manufacture analog and embedded processing semiconductors that are vital for nearly every type of electronic system today."




In February, TI announced its $11 billion investment in Utah, marking the largest economic investment in state history. LFAB2 will create approximately 800 additional TI jobs as well as thousands of indirect jobs, with first production available as early as 2026.

"TI's growing manufacturing presence in Utah will be transformative for our state, creating hundreds of good-paying jobs for Utahns to manufacture critically important technology," said Utah Governor Spencer Cox. "We are proud that semiconductors - made in Utah by Utahns - will power the innovation that is foundational to our country's economic and national security."

Building stronger communities
As part of TI's commitment to education, the company will invest $9 million dollars in the Alpine School District to develop the state's first Science, Technology, Engineering and Math (STEM) learning community for all students in kindergarten through 12th grade. The multiyear program will embed STEM concepts more deeply into coursework for the district's 85,000 students and provide STEM-oriented professional development for its teachers and administrators. The district-wide program will equip students with essential STEM skills, such as critical thinking, collaboration and creative problem-solving to succeed after graduation.

"We are excited this partnership will help our students develop essential knowledge and skills, preparing them for success in life and possible careers in the technology sector," said Alpine School District Superintendent, Dr. Shane Farnsworth. "Working together with the city of Lehi, Texas Instruments, and our schools, this collaborative investment will impact students and their families for many generations to come."

Building sustainably
TI has a long-standing commitment to responsible, sustainable manufacturing. LFAB2 will be one of the company's most environmentally efficient wafer fabs, designed to meet one of the Leadership in Energy and Environmental Design (LEED) building rating system's highest levels of structural efficiency and sustainability: LEED Gold version 4.

LFAB2 has a goal to be powered by 100% renewable electricity, and advanced 300-mm equipment and processes in Lehi will further reduce waste, water and energy consumption. In fact, LFAB2 is expected to recycle water at nearly twice the rate of TI's existing fab in Lehi.

Building the next era of semiconductor manufacturing
LFAB2 will complement TI's existing 300-mm wafer fabs, which include LFAB1 (Lehi, Utah), DMOS6 (Dallas), and RFAB1 and RFAB2 (both in Richardson, Texas). TI is also building four new 300-mm wafer fabs in Sherman, Texas (SM1, SM2, SM3 and SM4), with production from the first fab as early as 2025.

TI's manufacturing expansions, with anticipated support from the CHIPS and Science Act, will provide reliable supply of analog and embedded processing products. These investments in manufacturing and technology illustrate the company's commitment to long-term capacity planning.


View at TechPowerUp Main Site | Source
 
Joined
Mar 24, 2019
Messages
620 (0.33/day)
Location
Denmark - Aarhus
System Name Iglo
Processor 5800X3D
Motherboard TUF GAMING B550-PLUS WIFI II
Cooling Arctic Liquid Freezer II 360
Memory 32 gigs - 3600hz
Video Card(s) EVGA GeForce GTX 1080 SC2 GAMING
Storage NvmE x2 + SSD + spinning rust
Display(s) BenQ XL2420Z - lenovo both 27" and 1080p 144/60
Case Fractal Design Meshify C TG Black
Audio Device(s) Logitech Z-2300 2.1 200w Speaker /w 8 inch subwoofer
Power Supply Seasonic Prime Ultra Platinum 550w
Mouse Logitech G900
Keyboard Corsair k100 Air Wireless RGB Cherry MX
Software win 10
Benchmark Scores Super-PI 1M T: 7,993 s :CinebR20: 5755 point GeekB: 2097 S-11398-M 3D :TS 7674/12260
How do they deal with water in the dessert ?
 

TheLostSwede

News Editor
Joined
Nov 11, 2004
Messages
16,189 (2.27/day)
Location
Sweden
System Name Overlord Mk MLI
Processor AMD Ryzen 7 7800X3D
Motherboard Gigabyte X670E Aorus Master
Cooling Noctua NH-D15 SE with offsets
Memory 32GB Team T-Create Expert DDR5 6000 MHz @ CL30-34-34-68
Video Card(s) Gainward GeForce RTX 4080 Phantom GS
Storage 1TB Solidigm P44 Pro, 2 TB Corsair MP600 Pro, 2TB Kingston KC3000
Display(s) Acer XV272K LVbmiipruzx 4K@160Hz
Case Fractal Design Torrent Compact
Audio Device(s) Corsair Virtuoso SE
Power Supply be quiet! Pure Power 12 M 850 W
Mouse Logitech G502 Lightspeed
Keyboard Corsair K70 Max
Software Windows 10 Pro
Benchmark Scores https://valid.x86.fr/yfsd9w
How do they deal with water in the dessert ?
Watch the video, they have a short segment on it. That said, I still don't get why so many companies are building fabs in desert.
 
Joined
Apr 24, 2020
Messages
2,569 (1.73/day)
Did they release which process node they're aiming for?

300mm is the headline for a reason. A lot of what companies use are 200mm or even smaller, which is 50% less chip per... processing step... because 200mm diameter is 31400 mm^2 while 300mm is 70650 mm^2. Furthermore, TI focuses on older technology nodes, instead making cheaper transistors for Automotive and other industrial purposes.

So TI ain't making a 3nm fab here. I'd assume somewhere between 22nm and 90nm. But I'm curious which node they chose.
 

PCL

Joined
Aug 24, 2021
Messages
54 (0.05/day)
Did they release which process node they're aiming for?

300mm is the headline for a reason. A lot of what companies use are 200mm or even smaller, which is 50% less chip per... processing step... because 200mm diameter is 31400 mm^2 while 300mm is 70650 mm^2. Furthermore, TI focuses on older technology nodes, instead making cheaper transistors for Automotive and other industrial purposes.

So TI ain't making a 3nm fab here. I'd assume somewhere between 22nm and 90nm. But I'm curious which node they chose.
My money's on 28, but I'd love to be surprised and find out 14 is considered the new "workhorse".
 

TheLostSwede

News Editor
Joined
Nov 11, 2004
Messages
16,189 (2.27/day)
Location
Sweden
System Name Overlord Mk MLI
Processor AMD Ryzen 7 7800X3D
Motherboard Gigabyte X670E Aorus Master
Cooling Noctua NH-D15 SE with offsets
Memory 32GB Team T-Create Expert DDR5 6000 MHz @ CL30-34-34-68
Video Card(s) Gainward GeForce RTX 4080 Phantom GS
Storage 1TB Solidigm P44 Pro, 2 TB Corsair MP600 Pro, 2TB Kingston KC3000
Display(s) Acer XV272K LVbmiipruzx 4K@160Hz
Case Fractal Design Torrent Compact
Audio Device(s) Corsair Virtuoso SE
Power Supply be quiet! Pure Power 12 M 850 W
Mouse Logitech G502 Lightspeed
Keyboard Corsair K70 Max
Software Windows 10 Pro
Benchmark Scores https://valid.x86.fr/yfsd9w
Probably significantly cheaper land cost and wages
How would wages be cheaper when you have to relocate people to get enough competent staff to work at the fab?
Did you read any of the news about the Intel or TSMC Arizona fabs?
And what good is land if you can't get sufficient water and electricity supply?
 

Fourstaff

Moderator
Staff member
Joined
Nov 29, 2009
Messages
10,042 (1.90/day)
Location
Home
System Name Orange! // ItchyHands
Processor 3570K // 10400F
Motherboard ASRock z77 Extreme4 // TUF Gaming B460M-Plus
Cooling Stock // Stock
Memory 2x4Gb 1600Mhz CL9 Corsair XMS3 // 2x8Gb 3200 Mhz XPG D41
Video Card(s) Sapphire Nitro+ RX 570 // Asus TUF RTX 2070
Storage Samsung 840 250Gb // SX8200 480GB
Display(s) LG 22EA53VQ // Philips 275M QHD
Case NZXT Phantom 410 Black/Orange // Tecware Forge M
Power Supply Corsair CXM500w // CM MWE 600w
How would wages be cheaper when you have to relocate people to get enough competent staff to work at the fab?
Did you read any of the news about the Intel or TSMC Arizona fabs?
And what good is land if you can't get sufficient water and electricity supply?
Maybe they made a deal with the Mormon overlords? /s

I would think they have done their maths, 11 bln is not pocket change. They have existing operations there so its not greenfield.
 

TheLostSwede

News Editor
Joined
Nov 11, 2004
Messages
16,189 (2.27/day)
Location
Sweden
System Name Overlord Mk MLI
Processor AMD Ryzen 7 7800X3D
Motherboard Gigabyte X670E Aorus Master
Cooling Noctua NH-D15 SE with offsets
Memory 32GB Team T-Create Expert DDR5 6000 MHz @ CL30-34-34-68
Video Card(s) Gainward GeForce RTX 4080 Phantom GS
Storage 1TB Solidigm P44 Pro, 2 TB Corsair MP600 Pro, 2TB Kingston KC3000
Display(s) Acer XV272K LVbmiipruzx 4K@160Hz
Case Fractal Design Torrent Compact
Audio Device(s) Corsair Virtuoso SE
Power Supply be quiet! Pure Power 12 M 850 W
Mouse Logitech G502 Lightspeed
Keyboard Corsair K70 Max
Software Windows 10 Pro
Benchmark Scores https://valid.x86.fr/yfsd9w
Maybe they made a deal with the Mormon overlords? /s

I would think they have done their maths, 11 bln is not pocket change. They have existing operations there so its not greenfield.
Well, at least in this case, TI was already established on the location as you say, so it might be easier for them than Intel and TSMC. Even so, you need to find people willing to work shift jobs at the fabs and that's apparently not that easy.

At least it looks like they've got some more land to build on there.

screencapture-google-maps-search-Texas-Instruments-40-4380093-111-8341312-2388m-data-3m1-1e3-2...png
 

Fourstaff

Moderator
Staff member
Joined
Nov 29, 2009
Messages
10,042 (1.90/day)
Location
Home
System Name Orange! // ItchyHands
Processor 3570K // 10400F
Motherboard ASRock z77 Extreme4 // TUF Gaming B460M-Plus
Cooling Stock // Stock
Memory 2x4Gb 1600Mhz CL9 Corsair XMS3 // 2x8Gb 3200 Mhz XPG D41
Video Card(s) Sapphire Nitro+ RX 570 // Asus TUF RTX 2070
Storage Samsung 840 250Gb // SX8200 480GB
Display(s) LG 22EA53VQ // Philips 275M QHD
Case NZXT Phantom 410 Black/Orange // Tecware Forge M
Power Supply Corsair CXM500w // CM MWE 600w
Well, at least in this case, TI was already established on the location as you say, so it might be easier for them than Intel and TSMC. Even so, you need to find people willing to work shift jobs at the fabs and that's apparently not that easy.

At least it looks like they've got some more land to build on there.

View attachment 320438
If I am in their shoes, I will overstaff the existing LFAB1 and use it as training in preparation for LFAB2 when its ready. So its not that bad in terms of ramping up. Then again I am not in the manufacturing sector, so what do I know about ramping up a new factory.
 
Top