Thread: Project Sulaco
View Single Post
Old Aug 20, 2011, 12:01 PM   #8
tobyak
25 Posts
 
Join Date: Aug 2011
Posts: 25 (0.04/day)
Thanks: 5
Thanked 17 Times in 14 Posts

Its door fabrication time, that means HERE COMES THE DREMEL yay!!!!

First up, lets get this side taken apart




Tabs off, lets pop the window out



I will be using 1.5inch cutting discs from MNPCtech



Measuring up the new window bezel and making sure my cut lines are marked well inside the cut.... CUTTING YAY






Deburring



Well that took ages lol, but the results are exactly what i need



Next up, filling the acrylic for the window and starting the cut for the top mounting panel

Unfortunately i couldnt get any shots of cutting the acrylic out as the dust was getting in my camera, co lets ump to filing and sanding the cut edge

I will be using a rough sanding pad for this as i have a lot of material to remove



Whoops



Ahh there fixed, ther was never a huge chunk taken out of the edge... was there *swings hypnotists watch*

In the next post... i start work on the top panel
tobyak is offline  
Reply With Quote