Making silicon chips is not easy, requiring hugely expensive fabs, with massive clean-room environments and at every process shrink, the complexity and difficulty of making the things goes up significantly. It looks like TSMC and GlobalFoundries are both having serious yield problems with their 28 nm process nodes, according to Mike Bryant, technology analyst at Future Horizons and this is causing a rash of non-working wafers – to the point of having nothing working with some chip designs submitted for production. It seems that the root cause of these problems are to do with the pressures of bringing products to market, rather than an inherent problem with the technology; it just takes time that they haven't got to iron out the kinks and they're getting stuck: "Foundries have come under pressure to release cell libraries too early – which end up with designs that don't work," Bryant said. In an effort to try and be seen to treat every customer equally, TSMC is attempting to launch ten 28 nm designs from seven companies, but it's not working out too well: "At 45-nm, only NVIDIA was affected. At 28-nm any problems for TSMC will be problems for many customers" said Bryant.



GlobalFoundries are also struggling, although perhaps not quite as badly, according to Bryant: "However, there are recent comments of major yield problems with their 28-nm process actually being even worse than at GF [Globalfoundries]". Their 32 nm & 28 nm nodes are struggling, because they are using problematic gate first processing and this is worsened by the fact that they are using processes from two companies, AMD and IBM. Trying to debug two processes at once is causing serious headaches, compounded by a lack of cooperation between bases in Dresden and the US which appears to be caused by bad management.

Note that Bryant's assertions are at odds with what TSMC's CEO and chairman Morris Chang said when he spoke to analysts the previous day about the company's fourth quarter financial result: "Our 28-nm entered volume production last year and contributed 2 percent of 4Q11's wafer revenue. Defect density and new progress is ahead of schedule and is better than 40-45-nm at the corresponding stage of the ramp-up. We expect 28-nm ramp this year to be fast and we expect 28-nm will contribute more than 10 percent of total wafer revenue this year." It will soon become apparent who is right.

Regardkess, the pressure isn't going to let up for these companies, since Intel have been successfully manufacturing at the 32 nm level for a year, making their Sandy Bridge processors. On top of that, in April, Intel will introduce their significantly smaller 22 nm-based process technology in the form of their Ivy Bridge CPUs which have been demonstrated to work very well indeed. These are based on Intel's proprietary Tri-Gate 3D transistor technology too, which gives further performance increases, hence upping competitive pressures significantly.

Sources: TG Daily, EE Times

Last edited by qubit; Jan 23, 2012 at 06:53 AM.
qubit is offline  
Reply With Quote
The Following 7 Users Say Thank You to qubit For This Useful Post:
Old Jan 22, 2012, 09:03 PM   #2
the54thvoid
2000 Posts
 
the54thvoid's Avatar
 
Join Date: Dec 2009
Location: Scotland
Posts: 2,053 (1.64/day)
Thanks: 329
Thanked 854 Times in 504 Posts

System Specs

The real reason for 7970 scarcity, 7950 delay and Kepler's Q2 release???
__________________
My Heatware: http://www.heatware.com/eval.php?id=75854
the54thvoid is offline  
Reply With Quote
Old Jan 22, 2012, 09:12 PM   #3
Delta6326
2000 Posts
 
Delta6326's Avatar
 
Join Date: May 2008
Location: Iowa, USA
Posts: 3,287 (1.80/day)
Thanks: 557
Thanked 597 Times in 437 Posts
Send a message via AIM to Delta6326

System Specs

dang I wanted to get a 7950 hope this doesn't mean more delays or a higher price.
__________________
Delta6326 is offline  
Reply With Quote
Old Jan 22, 2012, 09:14 PM   #4
seronx
500 Posts
 
seronx's Avatar
 
Join Date: Jul 2010
Location: USA, Arizona, Maricopa
Posts: 938 (0.90/day)
Thanks: 36
Thanked 234 Times in 168 Posts

System Specs

Quote:
"However, there are recent comments of major yield problems with their 28-nm process actually being even worse than at GF [Globalfoundries]," Bryant told the audience.
But no wait if you read source #2 it says the opposite even though GlobalFoundries isn't in volume production the yields are still better

The only issue for GF is that volume production starts after Q2 2012(This has been known for sometime and some how the article makes it more grim than it sounds)

Last edited by seronx; Jan 22, 2012 at 09:21 PM.
seronx is offline  
Reply With Quote
The Following 2 Users Say Thank You to seronx For This Useful Post:
Old Jan 22, 2012, 09:45 PM   #5
Legacy-ZA
5 Posts
 
Legacy-ZA's Avatar
 
Join Date: Dec 2011
Posts: 20 (0.04/day)
Thanks: 2
Thanked 5 Times in 3 Posts

System Specs

Just another reason to raise prices. Pathetic.
Legacy-ZA is offline  
Reply With Quote
Old Jan 22, 2012, 09:50 PM   #6
SteelSix
200 Posts
 
Join Date: Nov 2008
Location: Atlanta, USA
Posts: 225 (0.14/day)
Thanks: 4
Thanked 49 Times in 30 Posts

Quote:
Originally Posted by Legacy-ZA View Post
Just another reason to raise prices. Pathetic.
Or to wait for things to shake out. Me, I'm done chasing product launches. It's not been easy, but I'm holding out..
SteelSix is offline  
Reply With Quote
Old Jan 22, 2012, 10:08 PM   #7
Aleksander
2000 Posts
 
Aleksander's Avatar
 
Join Date: Dec 2009
Posts: 3,028 (2.39/day)
Thanks: 648
Thanked 280 Times in 228 Posts

System Specs

Nvidia will again be affected
Anything to do with SWPA?
Aleksander is offline  
Reply With Quote
Old Jan 22, 2012, 10:15 PM   #8
Hokum
25 Posts
 
Hokum's Avatar
 
Join Date: Dec 2011
Location: Glossop, UK
Posts: 63 (0.12/day)
Thanks: 2
Thanked 9 Times in 5 Posts

System Specs

Isn't global foundries a spin off of AMD?
Hokum is offline  
Reply With Quote
Old Jan 22, 2012, 10:24 PM   #9
radrok
1000 Posts
 
radrok's Avatar
 
Join Date: Oct 2011
Location: Italy
Posts: 1,876 (3.28/day)
Thanks: 138
Thanked 455 Times in 357 Posts
Send a message via Skype™ to radrok

System Specs

I was somehow expecting something like this, isn't TMSC ALSO manufacturing SoC for smartphones/tablets? I am sure about Apple SoCs.
The advantage Intel has with the manufacturing process will probably give them an edge when entering on SoC market with Medfield while all the rest struggles with TMSC 28nm problems.

Quote:
Originally Posted by SteelSix View Post
Or to wait for things to shake out. Me, I'm done chasing product launches. It's not been easy, but I'm holding out..
There isn't the need to jump on 28nm graphics right now, assuming you are talking about graphics of course , consoles are holding the development and until they get a refresh the "older" 5xx/6xxx series are more than enough for playing.
radrok is offline  
Reply With Quote
Old Jan 22, 2012, 10:32 PM   #10
Dj-ElectriC
1000 Posts
 
Dj-ElectriC's Avatar
 
Join Date: Aug 2010
Location: Trollithia
Posts: 1,578 (1.56/day)
Thanks: 141
Thanked 643 Times in 300 Posts

System Specs

And they told us there absolutely no problems with 28nm manufacturing processes, way to go...
Dj-ElectriC is offline  
Reply With Quote
The Following User Says Thank You to Dj-ElectriC For This Useful Post:
Old Jan 22, 2012, 10:37 PM   #11
erocker
Senior Moderator
 
erocker's Avatar
 
Join Date: Jul 2006
Location: Milwaukee, WI.
Posts: 31,891 (12.77/day)
Thanks: 2,781
Thanked 12,268 Times in 7,811 Posts

System Specs

So.. according to TMSC:

Quote:
TSMC CEO Morris Chang insists the company's 28nm manufacturing process technologies remain on track.
As far as Glo-Fo goes, there is nothing but "rumor" according to TechEye that they are having problems.

Looks like it is definitely a bunch of FUD.
erocker is offline  
Reply With Quote
The Following 2 Users Say Thank You to erocker For This Useful Post:
Old Jan 22, 2012, 10:37 PM   #12
GC_PaNzerFIN
200 Posts
 
GC_PaNzerFIN's Avatar
 
Join Date: Oct 2009
Location: Finland
Posts: 378 (0.29/day)
Thanks: 22
Thanked 203 Times in 82 Posts

System Specs

I recently downgraded to GTX 460 from GTX 580 because I plan to upgrade to some even faster 28nm card. Although I wouldn't really NEED one right now (I can play everything I have now just fine, at decreased quality settings tho) I can't wait to get my hands on one. HD 7970 looks pretty tempting, especially the DC2 card, but I would really prefer NVIDIA. GK104 is definately coming first but that really isn't what I am looking for either, I am waiting for the GK100. Too bad it looks like I have to wait till H2 this year...
GC_PaNzerFIN is offline  
Reply With Quote
Old Jan 22, 2012, 10:38 PM   #13
seronx
500 Posts
 
seronx's Avatar
 
Join Date: Jul 2010
Location: USA, Arizona, Maricopa
Posts: 938 (0.90/day)
Thanks: 36
Thanked 234 Times in 168 Posts

System Specs

Quote:
Originally Posted by Hokum View Post
Isn't global foundries a spin off of AMD?
Of the foundries AMD owned + More

Fab 1 - Dresden, Germany
Fab 8 - Luther Forest Technology Campus, Saratoga County, New York, USA

Are the only two that AMD use to have ownership on

http://www.globalfoundries.com/manufacturing/300mm.aspx
http://www.globalfoundries.com/manufacturing/200mm.aspx

Everything else was Chartered Semiconductor

http://www.globalfoundries.com/manuf..._overview.aspx

Take note of this:

Quote:
Several centers of excellence for semiconductor and nanotechnology R&D are in close proximity to Fab 8. GLOBALFOUNDRIES is a member of the Joint Development Alliance (JDA) centered at East Fishkill, New York with several world leading product companies including IBM, Renesas, STMicroelectronics, Samsung Electronics, and Toshiba. With this alliance, GLOBALFOUNDRIES is driving the global standard for new technologies such as High-K Metal Gate. As a founding member of the JDA starting from 90nm, GLOBALFOUNDRIES has been able to leverage the collaborative R&D model to reduce the cost of process R&D that is projected to reach more than $1B US for 20nm and below. GLOBALFOUNDRIES also collaborates closely with the The College of Nanoscale Science and Engineering (CNSE) of the University at Albany - State University of New York (SUNY), a global education, research, development and technology deployment resource dedicated to preparing the next generation of scientists and researchers in nanotechnology.
If I had anything to speculate I would be saying GlobalFoundries is perfecting the process before going into volume rather than releasing the process in an unoptimized way

My guesses:
28nm-SHP => 28nm FD-SOI UTBOX HKMG eSiGe (Kaveri APU/Steamroller CPU)
28nm-HPP => 28nm Bulk HKMG eSiGe
28nm-HP => 28nm Bulk HKMG eSiGe
28nm-SLP => 28nm Bulk HKMG eSiGe
28nm-LPH => 28nm FD-SOI UTBOX HKMG eSiGe (Wichita/Krishna APUs(The current Bobcat is getting an extension on 40nm while these APUs are releasing next year))

Bold = Q2 2012 and later
Red Bold= Q4 2012 and later

Last edited by seronx; Jan 22, 2012 at 11:08 PM.
seronx is offline  
Reply With Quote
The Following User Says Thank You to seronx For This Useful Post:
Old Jan 22, 2012, 11:53 PM   #14
badtaylorx
200 Posts
 
Join Date: Aug 2011
Posts: 371 (0.58/day)
Thanks: 25
Thanked 131 Times in 45 Posts

System Specs

so much for the early summer price war
badtaylorx is online now  
Reply With Quote
Old Jan 23, 2012, 12:16 AM   #15
qubit
Overclocked quantum bit
 
qubit's Avatar
 
Join Date: Dec 2007
Location: Quantumville UK
Posts: 8,643 (4.34/day)
Thanks: 4,171
Thanked 3,301 Times in 1,941 Posts

System Specs

Quote:
Originally Posted by seronx View Post
But no wait if you read source #2 it says the opposite even though GlobalFoundries isn't in volume production the yields are still better

The only issue for GF is that volume production starts after Q2 2012(This has been known for sometime and some how the article makes it more grim than it sounds)
Yes, quite, thankyou. I'd meant to fix that bit before I published the article, so I'm not sure what happened. Fixed now.

Quote:
Originally Posted by erocker View Post
So.. according to TMSC:



As far as Glo-Fo goes, there is nothing but "rumor" according to TechEye that they are having problems.

Looks like it is definitely a bunch of FUD.
Yup, I'd meant to add that bit in too (TSMC's CEO statement). Fixed.
__________________
Siggie in the post.

Last edited by qubit; Jan 23, 2012 at 12:48 AM.
qubit is offline  
Reply With Quote
Old Jan 23, 2012, 12:23 AM   #16
a_ump
2000 Posts
 
a_ump's Avatar
 
Join Date: Nov 2007
Location: Fairmont, WV
Posts: 3,080 (1.53/day)
Thanks: 450
Thanked 316 Times in 293 Posts
Send a message via AIM to a_ump

System Specs

i really am never surprised about this when new process nodes are released. Every single one for the last 3 nodes or so seem to run into hiccups, i just accept it as that's how it'll always work. nothing new imo
__________________
My Heatware

MRCL:What if Jesus came by and Apocalypse actually would happen? Weer:Then I'd be more afraid that other works of fiction would come true, such as Harry Potter.”
a_ump is offline  
Reply With Quote
Old Jan 23, 2012, 12:44 AM   #17
OneCool
500 Posts
 
Join Date: Nov 2005
Location: Look behind you!!
Posts: 796 (0.29/day)
Thanks: 71
Thanked 58 Times in 39 Posts

Seems that the 28nm process is a mother... how long has this been giving them issues now 6-8 months?

You know Intel is sitting back laughing
OneCool is offline  
Reply With Quote
Old Jan 23, 2012, 02:01 AM   #18
seronx
500 Posts
 
seronx's Avatar
 
Join Date: Jul 2010
Location: USA, Arizona, Maricopa
Posts: 938 (0.90/day)
Thanks: 36
Thanked 234 Times in 168 Posts

System Specs

Quote:
Originally Posted by OneCool View Post
Seems that the 28nm process is a mother... how long has this been giving them issues now 6-8 months?
Most of the issues for GloFo is Gate First while TSMC doesn't have the same excuse
Once 28nm becomes full volume production it will mostly roll out
GF 28nm > TSMC 28nm

Quote:
Originally Posted by OneCool View Post
You know Intel is sitting back laughing
I would actually wait and see Intel has been getting some backlash about lying about tidbits of their 22nm Tri-gate process
seronx is offline  
Reply With Quote
Old Jan 23, 2012, 02:30 AM   #19
ice_v
75 Posts
 
ice_v's Avatar
 
Join Date: Sep 2010
Location: Italy
Posts: 101 (0.10/day)
Thanks: 73
Thanked 8 Times in 7 Posts

Quote:
Originally Posted by OneCool View Post
Seems that the 28nm process is a mother... how long has this been giving them issues now 6-8 months?

You know Intel is sitting back laughing
lol true

of all the chip players, Intel is one of the few that can actually relax for at least the entire Q1.
__________________
Dark Souls For PC
ice_v is offline  
Reply With Quote
Old Jan 23, 2012, 03:09 AM   #20
Protagonist
500 Posts
 
Protagonist's Avatar
 
Join Date: Sep 2010
Posts: 674 (0.68/day)
Thanks: 18
Thanked 112 Times in 86 Posts

System Specs

Damn, but I'm not in a harry to get new graphic card, too bud for TSMC they've been having this issue for a while now.

While Intel seem to be yanking out new process with less strain than TSMC or any other fab.

And there was an article here stating that Intel has 14nm chips already being tested in their labs as of last year, and its not due till 2014 i think, that's how Intel does it, If they are to release new nanometer they start preparing years in advance.
Protagonist is offline  
Reply With Quote
Old Jan 23, 2012, 03:16 AM   #21
dude12564
200 Posts
 
Join Date: Dec 2011
Location: Toronto, Ontario, Canada
Posts: 457 (0.88/day)
Thanks: 640
Thanked 216 Times in 127 Posts

System Specs

Quote:
Originally Posted by st.bone View Post
And there was an article here stating that Intel has 14nm chips already being tested in their labs as of last year, and its not due till 2014 i think, that's how Intel does it, If they are to release new nanometer they start preparing years in advance.
That should be correct, i think it's Broadwell (Shrink of Haswell) and Airmont (Successor of Silvermont, which is then the successor of Medfield) coming out, if Intel keeps their Tick-Tock going.
dude12564 is online now  
Crunching for Team TPU
Reply With Quote
The Following User Says Thank You to dude12564 For This Useful Post:
Old Jan 23, 2012, 03:39 AM   #22
Protagonist
500 Posts
 
Protagonist's Avatar
 
Join Date: Sep 2010
Posts: 674 (0.68/day)
Thanks: 18
Thanked 112 Times in 86 Posts

System Specs

Quote:
Originally Posted by dude12564 View Post
That should be correct, i think it's Broadwell (Shrink of Haswell) and Airmont (Successor of Silvermont, which is then the successor of Medfield) coming out, if Intel keeps their Tick-Tock going.
You seem to know the details. I've had this info before, do you by any chance know where i can find Intel's read map, i used to find them on their website but nowadays i cant seem to see them, so if you can find the road map please post it or post a link preferably PDF
Protagonist is offline  
Reply With Quote
Old Jan 23, 2012, 03:54 AM   #23
xenocide
1000 Posts
 
xenocide's Avatar
 
Join Date: Mar 2011
Location: Burlington, VT
Posts: 1,706 (2.16/day)
Thanks: 228
Thanked 404 Times in 297 Posts

System Specs

Quote:
Originally Posted by st.bone View Post
And there was an article here stating that Intel has 14nm chips already being tested in their labs as of last year, and its not due till 2014 i think, that's how Intel does it, If they are to release new nanometer they start preparing years in advance.
It said that they were testing early forms of it. It's not like they have tons of those sitting around. Intel goes out of their way to find the best engineers they can. GF has been doing a lot of talent hunting in the past year or so for a plant they are openning in NY as well, but Intel is definitely top dog.
__________________
If BF3 doesn't turn out to be the biggest selling PC shooter of all time, then I will eat my graphics card. -MatTheCat
xenocide is offline  
Reply With Quote
Old Jan 23, 2012, 04:48 AM   #24
seronx
500 Posts
 
seronx's Avatar
 
Join Date: Jul 2010
Location: USA, Arizona, Maricopa
Posts: 938 (0.90/day)
Thanks: 36
Thanked 234 Times in 168 Posts

System Specs

Capacity: 1st. Intel 2nd. GlobalFoundries & Samsung
Development: 1st. Intel 2nd. Anyone part of the SOI Consortium(IBM, GlobalFoundries, STMicroelectrics, etc.
Production of the Highest End: 1. GlobalFoundries 2. Intel

GlobalFoundries 32nm-SHP should be the most expensive process yet it is cheaper than Intel's 32nm high-end process

There is no way 315.8mm² of 32nm-SHP actually costs $245- and 32nm from Intel at 200-295mm² costs $285+

Last edited by seronx; Jan 23, 2012 at 04:56 AM.
seronx is offline  
Reply With Quote
Old Jan 23, 2012, 06:30 AM   #25
largon
2000 Posts
 
largon's Avatar
 
Join Date: May 2005
Location: Tre, Suomi Finland
Posts: 2,696 (0.92/day)
Thanks: 1
Thanked 437 Times in 335 Posts

System Specs

Quote:
Originally Posted by seronx View Post
Capacity: 1st. Intel 2nd. GlobalFoundries & Samsung
And I thought AMD actually had to buy fabbing from a subsidiary. (Sorry for the sarcasm.)
Quote:
Development: 1st. Intel 2nd. Anyone part of the SOI Consortium(IBM, GlobalFoundries, STMicroelectrics, etc.
I guess by "development" you only meant the lenght of the development cycle, not technological advancement, shrinkage of fab processes, etc.
Quote:
Production of the Highest End: 1. GlobalFoundries 2. Intel
Yet, AMD's chips are slower and consume considerably more power.
__________________
You were not supposed to see this.
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ
ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ

Suum cuique pulchrum est.
largon is offline  
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
AMD and Globalfoundries claim 50% Improvement nt300 General Hardware 2 Dec 29, 2011 03:45 AM
Asus Maximus IV Extreme-Z struggles to boot POGE Overclocking & Cooling 4 Aug 3, 2011 09:43 PM
GLOBALFOUNDRIES Appoints VP of Marketing btarunr News 3 Sep 13, 2009 10:27 PM
Bloodbath for AMD at the Stock-Markets, Company Struggles to Survive btarunr News 116 Jul 16, 2008 07:08 PM
Fusion MCM By AMD & TSMC HellasVagabond News 1 Jul 26, 2007 02:04 PM


All times are GMT. The time now is 05:52 PM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.
no new posts