TSMC Reiterates 28 nm Readiness by Q4 2011
TSMC reiterated that it will be ready with a 28 nanometer manufacturing process by Q4 2011. The semiconductor company handles manufacturing of graphics processors for both AMD and NVIDIA. After the current 40 nm process, 32 nm, the next milestone process, was canceled for GPU makers to leap to 28 nm, this caused the foundry transition to the next process to take longer than usual. The current 40 nm process already seems to be saturated by GPUs with over 3 billion transistors, which are barely able to maintain acceptable thermal specs without using some sort of power-load throttling mechanism.
TSMC Chairman and CEO, Morris Chang, confirmed that tape-outs will be starting as early as in Q3, and production of 28 nm chips will start in Q4. Chang expects that up to 3% of TSMC's revenues will be made from 28 nm chips by the end of the year. "We plan to have around 2% or 3% of our total revenue in the fourth quarter [to] be 28nm. The tape-outs of the 28-nanaometer will start to ramp in the second half, starting in the third quarter and then more in the fourth quarter. But the real momentum [for 28nm], we believe, will be next year," Chang said. Apart from GPUs, the 28 nm process will also benefit ARM processors, with multi-core ARM chips clocked at 3 GHz being on cards. The 28 nm bulk process will also dish out AMD's next generation accelerated processing units (APUs). Source: X-bit Labs |
|
|
|
|
|
#2 |
|
Guest
Posts: n/a (0/day)
|
I don't trust TSMC. Even today, they still have problems with yields on 40nm process. (nvidia knows why...
)Besides, Intel is already aiming for 22nm this year, so 28nm doesn't seems that spectacular. |
|
|
|
#3 |
![]() Join Date: Jan 2005
Location: 66 feet from the ground
Posts: 825 (0.27/day)
Thanks: 66
Thanked 107 Times in 70 Posts
|
lower the nm higher the losses & errors ....
__________________
|
|
|
|
|
|
#4 |
![]() |
... but increase the yield per wafer?
Speaking of, I was just looking at a 1155 chip without the heatspreader. Seems full up. Is there any room left for adding more cores to 1155? |
|
|
|
| The Following User Says Thank You to LAN_deRf_HA For This Useful Post: |
|
|
#5 | ||
![]() Join Date: Jul 2010
Location: Philly
Posts: 1,599 (1.55/day)
Thanks: 1,004
Thanked 765 Times in 539 Posts
|
Quote:
So far as I know there isn't a whole hell of a lot stopping AMD from switching to GlobalFoundries or other closely allied fabs (can't remember names right now...). Quote:
http://www.anandtech.com/show/4118/a...ndy-bridge-die Those are some packed chips! Nevertheless I'm pretty sure I heard that 1155 would still be getting some Ivy Bridge chips (with more cores).
__________________
|
||
|
|
|
|
|
#6 |
|
Guest
Posts: n/a (0/day)
|
|
|
|
|
#7 | |
![]() Join Date: Aug 2008
Location: Hampshire, UK
Posts: 476 (0.27/day)
Thanks: 24
Thanked 108 Times in 87 Posts
|
Quote:
Last edited by robal; Feb 3, 2011 at 03:22 PM. Reason: CRLF |
|
|
|
|
|
|
#8 |
![]() Join Date: Aug 2007
Location: East Coast, USA
Posts: 2,041 (0.97/day)
Thanks: 210
Thanked 302 Times in 245 Posts
|
This is a step in the right direction. I cannot wait for next gen 22nm CPUs and 28nm graphics cards! Sooooooooooo exciting!!
__________________
co5 is cal i htpc: work in progress.. HeatWare - http://www.heatware.com/eval.php?id=71725 |
|
|
|
|
|
#9 |
![]() Join Date: Aug 2010
Location: Britland
Posts: 1,531 (1.51/day)
Thanks: 322
Thanked 200 Times in 162 Posts
|
I was kind of hoping that the tape-outs would start around Q2 then start to ramp in Q3 for product releases at the end of Q3/start of Q4 but i guess from this the release times of the next gen 28nm chips will be around the same kind of time frames as the past two 40nm product generations, something like mid Q4.
__________________
The pastafarian jesus |
|
|
|
|
|
#10 |
|
Knowledgeable Posting Whore
Join Date: Aug 2010
Location: Seattle, WA
Posts: 5,743 (5.78/day)
Thanks: 1,270
Thanked 1,078 Times in 831 Posts
|
KEPLER!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
TSMC better not bend nvidia over backwards and F*** them again! |
|
|
|
|
|
#11 | |
![]() Join Date: Aug 2010
Location: Britland
Posts: 1,531 (1.51/day)
Thanks: 322
Thanked 200 Times in 162 Posts
|
Quote:
![]() I really want Nvidia to be a viable option to users who want to run three monitors from a single card, i also hope both AMD and Nvidia can bring out their 28nm cards pretty close together so it's easier/little waiting time to chose between them.
__________________
The pastafarian jesus |
|
|
|
|
|
|
#12 | |
|
Knowledgeable Posting Whore
Join Date: Aug 2010
Location: Seattle, WA
Posts: 5,743 (5.78/day)
Thanks: 1,270
Thanked 1,078 Times in 831 Posts
|
Quote:
|
|
|
|
|
|
|
#13 |
![]() Join Date: May 2005
Location: Tre, Suomi Finland
Posts: 2,696 (0.92/day)
Thanks: 1
Thanked 437 Times in 335 Posts
|
__________________
You were not supposed to see this. ŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻŻ Suum cuique pulchrum est. |
|
|
|
![]() |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| TSMC Achieves 28 nm SRAM Yield Breakthrough | btarunr | News | 10 | Aug 26, 2009 08:29 PM |
| Intel and TSMC Collaborate | malware | News | 3 | Mar 2, 2009 11:38 PM |
| Dresden FAB 38 is superior to TSMC | wolf2009 | AMD / ATI | 4 | Aug 20, 2008 03:09 PM |
| FS: Retail Vista Ultimate 32/64bit w/ Business Sales Readiness Kit | thebeephaha | Buy/Sell/Trade/Giveaway Forum | 6 | Sep 29, 2007 07:22 AM |
| TSMC ready with 65 nanometre | D_o_S | News | 0 | Jul 25, 2006 01:03 PM |