• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

How should I install this ceiling mount?

T

twilyth

Guest
I have this Telehook mount that I'm initially going to use with a 42" LCD.

My problem is that it has a circular mounting bracket that is wider than the beams (joists) that I can attach it to.

So I'm try to figure the best way around this. The beams are 2x12's that are 12" on center. So I'm thinking about cutting 2 10" pieces of 4x4 and using 4" screws to bridge 2 of the beams. Then I'll bolt the bracket into the 4x4's.

Any other ideas?
 
Joined
Jul 19, 2006
Messages
43,587 (6.72/day)
Processor AMD Ryzen 7 7800X3D
Motherboard ASUS TUF x670e
Cooling EK AIO 360. Phantek T30 fans.
Memory 32GB G.Skill 6000Mhz
Video Card(s) Asus RTX 4090
Storage WD m.2
Display(s) LG C2 Evo OLED 42"
Case Lian Li PC 011 Dynamic Evo
Audio Device(s) Topping E70 DAC, SMSL SP200 Headphone Amp.
Power Supply FSP Hydro Ti PRO 1000W
Mouse Razer Basilisk V3 Pro
Keyboard Tester84
Software Windows 11
Your idea of doing it is the same way I would do it.
 
Joined
Oct 5, 2010
Messages
861 (0.17/day)
System Name FragBox
Processor Intel Core i7 2600K @ 5.0GHz/1.45 volts
Motherboard Asus P8Z77 WS
Cooling Custom CPU loop
Memory Kingston 12GB DDR3 1600
Video Card(s) Galaxy GTX 680/Zotac GTX 680 in SLi/EVGA GTX 650Ti
Storage 2 Vertex 3 120's, raid 0, 2 Seagate Momentus XT 500GB's in raid 0, 1 Hitatchi 2TB for backup
Display(s) 3 Acer S232HLX2 in nvidia surround
Case Corsair C70 White
Audio Device(s) Onboard
Power Supply Corsair AX1200
Software Win 7 x64 Pro
I've done stuff like that before, never had an issue with a 47 or a 55 display
 
Joined
May 23, 2010
Messages
507 (0.10/day)
System Name Home Theatre
Processor i5 750
Motherboard Gigabyte P55 USB3
Memory 4GB ADATA 1333
Video Card(s) Sapphire 1GB ATI 5670
Storage 32gb Kingston SSD (Os)/ 1TB and 640GB Caviar Blue (Storage)
Display(s) Sony KDL40HX800
Case Cooler Master HAF 922
Audio Device(s) HT Claro Plus
Power Supply Corsair HX650
Software Windows 7 64-bit
I'd highly suggest that if you have an attic that leads to where you are going to hang that mount place two 1/2" wood boards separetely both side of your beam so that it will lock in better. I'd highly suggest you do that; I did it makes for a better piece of mind.:rolleyes:
 
Joined
Nov 4, 2005
Messages
11,687 (1.73/day)
System Name Compy 386
Processor 7800X3D
Motherboard Asus
Cooling Air for now.....
Memory 64 GB DDR5 6400Mhz
Video Card(s) 7900XTX 310 Merc
Storage Samsung 990 2TB, 2 SP 2TB SSDs and over 10TB spinning
Display(s) 56" Samsung 4K HDR
Audio Device(s) ATI HDMI
Mouse Logitech MX518
Keyboard Razer
Software A lot.
Benchmark Scores Its fast. Enough.
Open or covered beams?

Open beams running 90 deg the other direction use a 2 X 8 and hang it with three screws 3" in length screwed into the bottom edge of the 2 X 12's, if they are covered do the same.


4" screws into a 4 X 4 block could cause splitting and will look like ass. A nice piece of matching wood screwed to the bottom edge will cause less damage and a 2 X 8 will be less prone to splitting.
 
T

twilyth

Guest
I forgot to mention that the beams are covered with drywall, so I'll be working blind whichever approach I use. I can get pretty close using some "landmarks" and some basic measurements, but I need some room for error.

also, I have a stud finder that measures density (as opposed to the kind that just looks for nails). So with that, I can probably get to within 1/2" of my target.
I'd highly suggest that if you have an attic that leads to where you are going to hang that mount place two 1/2" wood boards separetely both side of your beam so that it will lock in better. I'd highly suggest you do that; I did it makes for a better piece of mind.:rolleyes:
This is the other approach I was thinking about except that the distance across the bracket, from hole to hole is about 3". So I can attach a couple of 2x4's to the beam and then sink one each of the mounting screws into the 2x4's and the other 2 into the beam. Except in that case, I'm worried about splitting the 2x4's.

I would use very thin wood screws with a torx head for the 4x4's. I've used these in studs without pilot holes with very good results and no splitting. Also, I sink them at a downward angle so I'd be going across the grain.

Another thing that was bothering me was the screws the mount comes with. These are huge lag bolts that are better suited to masonry than wood. I've used something similar on my beams and they worked but I had to hit the beam dead center. I don't really want to chance that this time around so I'm thinking of longer but thinner screws with washers if necessary rather than the screws it comes with.
 
Joined
Jan 17, 2010
Messages
12,280 (2.36/day)
Location
Oregon
System Name Juliette // HTPC
Processor Intel i7 9700K // AMD Ryzen 5 5600G
Motherboard ASUS Prime Z390X-A // ASRock B550 ITX-AC
Cooling Noctua NH-U12 Black // Stock
Memory Corsair DDR4 3600 32gb //G.SKILL Trident Z Royal Series 16GB (2 x 8GB) 3600
Video Card(s) ASUS RTX4070 OC// GTX 1650
Storage Samsung 970 EVO NVMe 1Tb, Intel 665p Series M.2 2280 1TB // Samsung 1Tb SSD
Display(s) ASUS VP348QGL 34" Quad HD 3440 x 1440 // 55" LG 4K SK8000 Series
Case Seasonic SYNCRO Q7// Silverstone Granada GD05
Audio Device(s) Focusrite Scarlett 4i4 // HDMI to Samsung HW-R650 sound bar
Power Supply Seasonic SYNCRO 750 W // CORSAIR Vengeance 650M
Mouse Cooler Master MM710 53G
Keyboard Logitech 920-009300 G512 SE
Software Windows 10 Pro // Windows 10 Pro
2 - 2X4 blocks flat between the joists would do fine. No need to use 4x4s Install threw the attic
Place a 4"metal outlet box between the 2X4 screwed into the 2X4 and joist. Hanging the thickness of the drywall below the joist. The mount attaches to the metal box with screws and the wires go threw the box. This would be the correct way. You should only have to cut a 4X4 hole in the drywall. It all installs from the attic. If there is not attic access then your cutting a bigger hole
 
Last edited:
Joined
May 23, 2010
Messages
507 (0.10/day)
System Name Home Theatre
Processor i5 750
Motherboard Gigabyte P55 USB3
Memory 4GB ADATA 1333
Video Card(s) Sapphire 1GB ATI 5670
Storage 32gb Kingston SSD (Os)/ 1TB and 640GB Caviar Blue (Storage)
Display(s) Sony KDL40HX800
Case Cooler Master HAF 922
Audio Device(s) HT Claro Plus
Power Supply Corsair HX650
Software Windows 7 64-bit
I forgot to mention that the beams are covered with drywall, so I'll be working blind whichever approach I use. I can get pretty close using some "landmarks" and some basic measurements, but I need some room for error.

also, I have a stud finder that measures density (as opposed to the kind that just looks for nails). So with that, I can probably get to within 1/2" of my target.

I don't know if you would do this but this is a clever idea (well I think) that might work for you. If you know the exact beam that you are going to puncture. Then you should start from the attic by using a super thin drill bit just to puncture the beam from the attic to the ceiling of the dry wall. Of course, this method would mean that you would not know exactly where it will come out from the ceiling, but you would know that it is exactly in the middle of the beam. Then you could go back down to where you are going to drill the screws and use the already marked hole as where you will drill.
 
T

twilyth

Guest
2 - 2X4 blocks flat between the joists would do fine. No need to use 4x4s Install threw the attic
Place a 4"metal outlet box between the 2X4 screwed into the 2X4 and joist. Hanging the thickness of the drywall below the joist. The mount attaches to the metal box with screws and the wires go threw the box. This would be the correct way. You should only have to cut a 4X4 hole in the drywall. It all installs from the attic. If there is not attic access then your cutting a bigger hole
The mount has cable management via the interior of the telescoping tubes. I just need power and HDMI - depending on what I connect to it. Running the cables into the attic would mean finding a way to snake them back into the livingroom since that's where the console and other input devices will be. Although the idea of using an electrical box is ingenious. :toast:
I don't know if you would do this but this is a clever idea (well I think) that might work for you. If you know the exact beam that you are going to puncture. Then you should start from the attic by using a super thin drill bit just to puncture the beam from the attic to the ceiling of the dry wall. Of course, this method would mean that you would not know exactly where it will come out from the ceiling, but you would know that it is exactly in the middle of the beam. Then you could go back down to where you are going to drill the screws and use the already marked hole as where you will drill.
The beams are 12" deep but I could drill small holes on either side. However the Zircon density sensor I have is pretty precise. In the past I've always been able to find the exact center of a beam or stud - even when it was covered with both drywall and wood paneling.

What do you guys think about substituting thinner mounting screws for the lag screws/bolts that come with the mount? The screws I have are about 3/8" across (thread ridge to ridge), maybe a bit more. If I use those, I'd probably lean toward using the 4x4's with 3/16th to 1/4" pilot holes - I'd sink 2 screws per 4x4. I'd attach the 4x4's to beams using cross angled scews - 2 on an angle from the 4x4 to the beam and 2 from the beam to the 4x4.
 
Joined
Aug 2, 2009
Messages
4,013 (0.75/day)
You are seriously over thinking all of this. The maximum load the mount is rated for is 55 pounds, which could be held by a single screw of the torx variety you mentioned earlier. The 4x4s would look goofy, and are unnecessary.

Steevo has the best plan with the 2x8, as your bracket plate is 6" wide, the 2x8 is 7 1/4" wide, giving you a 5/8" reveal on the sides. If you want more, use a 2x10, which measures 9 1/4". Cut it 15" long, champher the edges so they don't look so crappy, put three 3 1/2" torx heads into each joist. Done. Even though they are retarded, I'd use the lags that came with the package just for liability sake. Predrill 1/4" holes like they say and use a ratchet.

If you can get in the attic, cut 2 2x10s 10 7/16" long, take them up there with a cordless screw gun, lay flat on the drywall, and put 4 screws through the 2x12s into the end grain of your 2x10 blocks on each side. Done. Can't see it from below. Simple as that.
 
T

twilyth

Guest
You are seriously over thinking all of this. The maximum load the mount is rated for is 55 pounds, which could be held by a single screw of the torx variety you mentioned earlier. The 4x4s would look goofy, and are unnecessary.

Steevo has the best plan with the 2x8, as your bracket plate is 6" wide, the 2x8 is 7 1/4" wide, giving you a 5/8" reveal on the sides. If you want more, use a 2x10, which measures 9 1/4". Cut it 15" long, champher the edges so they don't look so crappy, put three 3 1/2" torx heads into each joist. Done. Even though they are retarded, I'd use the lags that came with the package just for liability sake. Predrill 1/4" holes like they say and use a ratchet.

If you can get in the attic, cut 2 2x10s 10 7/16" long, take them up there with a cordless screw gun, lay flat on the drywall, and put 4 screws through the 2x12s into the end grain of your 2x10 blocks on each side. Done. Can't see it from below. Simple as that.
I tried to explain this before but I guess I didn't do a very good job. The beams are covered with drywall and I see no reason to start cutting away any drywall.

So while 4x4's would be overkill, it doesn't matter since you won't ever see them. The only consideration is easy of installation and structural integrity.

Also, I don't think you understand how huge the lag bolts are, so here is a picture with a quarter to give you an idea of scale.

 
Joined
Aug 2, 2009
Messages
4,013 (0.75/day)
Yeah, I know how big they are, use them all the time. I don't think I talked about cutting drywall, but I don't think I understood you. I think you were doing what I was talking about in option 2. You are going to put the 4x4s in the attic? I thought you were going to toe screw them from the bottom, on the outside of the drywall.:laugh:
 
Top