- Joined
- Oct 22, 2014
- Messages
- 13,210 (3.80/day)
- Location
- Sunshine Coast
System Name | Black Box |
---|---|
Processor | Intel Xeon E3-1260L v5 |
Motherboard | MSI E3 KRAIT Gaming v5 |
Cooling | Tt tower + 120mm Tt fan |
Memory | G.Skill 16GB 3600 C18 |
Video Card(s) | Asus GTX 970 Mini |
Storage | Kingston A2000 512Gb NVME |
Display(s) | AOC 24" Freesync 1m.s. 75Hz |
Case | Corsair 450D High Air Flow. |
Audio Device(s) | No need. |
Power Supply | FSP Aurum 650W |
Mouse | Yes |
Keyboard | Of course |
Software | W10 Pro 64 bit |
Finishing development can mean tape out and production has been completed and it is close to release to the consumer.A few days ago we got information that Vega is soon finishing development. So the final design is not even taped out yet, which means that QA samples are at least 3 months after tape out, and the finished product is 6-9 months away. Remember that GP104 was finished in development and taped out in ~June 2015.
AMD have something cooking that beats a 1080 and it's only 4Gb.
I've been seeing a few FS benches come through like this one in Icestorm.
http://www.3dmark.com/is/3839964?_ga=1.71611927.507117041.1462523653