• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

Intel Retires "Lakefield," "Comet Lake-U," and "Ice Lake-U" Processors

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
46,283 (7.69/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
Intel on Tuesday issued product-change notifications (PCNs) to announce the discontinuation of its first Hybrid processors, codenamed "Lakefield," besides 15-Watt U-segment variants of its "Ice Lake" and "Comet Lake" mobile processors. With the product discontinuation notice put out, it sets the ball rolling toward a year-long process where Intel solicits its final orders for these chips from OEMs and distributors, fulfills these orders last by 2022, and marks these parts "End of Life" (EOL).

Intel's mobile processor segment is dominated by the "Tiger Lake" microarchitecture on the 10 nm SuperFin node. Quad-core variants of the architecture cover the 15 W Y- and U-segments, while 8-core variants span the 35 W to 55 W H-segments for mainstream notebooks. Intel's next hybrid mobile processor, the "Alder Lake-P," is expected arrive in Q4-2021.



View at TechPowerUp Main Site
 
Joined
Sep 17, 2014
Messages
20,780 (5.97/day)
Location
The Washing Machine
Processor i7 8700k 4.6Ghz @ 1.24V
Motherboard AsRock Fatal1ty K6 Z370
Cooling beQuiet! Dark Rock Pro 3
Memory 16GB Corsair Vengeance LPX 3200/C16
Video Card(s) ASRock RX7900XT Phantom Gaming
Storage Samsung 850 EVO 1TB + Samsung 830 256GB + Crucial BX100 250GB + Toshiba 1TB HDD
Display(s) Gigabyte G34QWC (3440x1440)
Case Fractal Design Define R5
Audio Device(s) Harman Kardon AVR137 + 2.1
Power Supply EVGA Supernova G2 750W
Mouse XTRFY M42
Keyboard Lenovo Thinkpad Trackpoint II
Software W10 x64
Sad to see you go, but its like I never knew ya

What a mess
 

bug

Joined
May 22, 2015
Messages
13,163 (4.07/day)
Processor Intel i5-12600k
Motherboard Asus H670 TUF
Cooling Arctic Freezer 34
Memory 2x16GB DDR4 3600 G.Skill Ripjaws V
Video Card(s) EVGA GTX 1060 SC
Storage 500GB Samsung 970 EVO, 500GB Samsung 850 EVO, 1TB Crucial MX300 and 2TB Crucial MX500
Display(s) Dell U3219Q + HP ZR24w
Case Raijintek Thetis
Audio Device(s) Audioquest Dragonfly Red :D
Power Supply Seasonic 620W M12
Mouse Logitech G502 Proteus Core
Keyboard G.Skill KM780R
Software Arch Linux + Win10
Same comment as for new product "announcements": if we can't get the parts anyway, how can we tell?
 
D

Deleted member 185088

Guest
According to Anandtech they were rather poor CPUs.
 

tabascosauz

Moderator
Supporter
Staff member
Joined
Jun 24, 2015
Messages
7,457 (2.33/day)
Location
Western Canada
System Name ab┃ob
Processor 7800X3D┃5800X3D
Motherboard B650E PG-ITX┃B550-I Strix
Cooling PA120+T30┃AXP120x67
Memory 64GB 6000CL30┃32GB 3600CL14
Video Card(s) RTX 4070 Ti Eagle┃RTX A2000
Storage 8TB of SSDs┃1TB SN550
Display(s) 43" QN90B / 32" M32Q / 27" S2721DGF
Case Caselabs S3┃Lone Industries L5
Power Supply Corsair HX1000┃HDPlex
Comet Lake-U was directly replaced by Ice Lake-U. Plenty of Ice Lake products.

Ice Lake-U was directly superseded by Tiger Lake-U (with the G1/G4/G7 Xe iGPU). Plenty of Tiger Lake products.

Lakefield was basically a product demonstrator and practice round for Intel hybrid cores. Not that it was well received anyways.

None of the three is any surprise, and the first two should have been EOLed long ago, I'm assuming 10nm Superfin supply issues and Tiger Lake-U market positioning kept them around for a bit.
 
Joined
Feb 19, 2009
Messages
1,151 (0.21/day)
Location
I live in Norway
Processor R9 5800x3d | R7 3900X | 4800H | 2x Xeon gold 6142
Motherboard Asrock X570M | AB350M Pro 4 | Asus Tuf A15
Cooling Air | Air | duh laptop
Memory 64gb G.skill SniperX @3600 CL16 | 128gb | 32GB | 192gb
Video Card(s) RTX 4080 |Quadro P5000 | RTX2060M
Storage Many drives
Display(s) M32Q,AOC 27" 144hz something.
Case Jonsbo D41
Power Supply Corsair RM850x
Mouse g502 Lightspeed
Keyboard G913 tkl
Software win11, proxmox
Benchmark Scores 33000FS, 16300 TS. Lappy, 7000 TS.
Comet Lake-U was directly replaced by Ice Lake-U. Plenty of Ice Lake products.

Ice Lake-U was directly superseded by Tiger Lake-U (with the G1/G4/G7 Xe iGPU). Plenty of Tiger Lake products.

Lakefield was basically a product demonstrator and practice round for Intel hybrid cores. Not that it was well received anyways.

None of the three is any surprise, and the first two should have been EOLed long ago, I'm assuming 10nm Superfin supply issues and Tiger Lake-U market positioning kept them around for a bit.
comet lake-u was not replaced by ice lake U at all, but tiger lake sure.
 
Top