• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

Activision not counting on Diablo III in 2011

Joined
Dec 4, 2010
Messages
442 (0.09/day)
Processor X5650 @3,7 Ghz
Motherboard Gigabyte Ga-EX58-UD5
Cooling Cogage True Spirit
Memory 2x8 GB Kingston HyperX Fury 1866 CL10
Video Card(s) Gigabyte G1 Gaming GTX 1070
Storage 250Gb MX100 SSD+1TB WD Green
Display(s) QNIX QX2710 2560x1440 27" PLS 96Hz
Case NZXT Tempest
Power Supply Corsair RM750 750w 80 Plus Gold Modular
Keyboard Logitech K120
Software Win 10 Home 64 bits
Joined
Jul 14, 2009
Messages
913 (0.17/day)
Location
Baltimore, MD
System Name Cool Runnings Mark 2
Processor i7 4770k No OC
Motherboard MSI Z87 MPower
Cooling Noctua NH-D14
Memory GSkill TridentX 2400MHz 32GB
Video Card(s) MSI GTX 1070 Ti Duke, EVGA GTX 780 AC+
Storage Crucial MX500 1TB SSD, 3 more HDDs
Display(s) 2x MSI 32" 2560 x 1440 144Hz Optix MAG321CQR, Acer G276HLDbd Black 27" 6ms
Case Corsair 600t
Power Supply Corsair HX850
Mouse Razer DeathAdder
Keyboard Steelseries Merc Stealth
Software Win10 Pro 64-bit
well that sucks, im looking forward to d3. does the sc2 zerg expansion not count as a major release? i thought that was being released this year...
 
Joined
Aug 17, 2009
Messages
2,558 (0.48/day)
Location
United States
System Name Aluminum Mallard
Processor Ryzen 1900x
Motherboard AsRock Phantom 6
Cooling AIO
Memory 32GB
Video Card(s) EVGA 3080Ti FTW
Storage SSD
Display(s) Benq Zowie
Case Cosmos 1000
Audio Device(s) On Board
Power Supply Corsair CX750
VR HMD HTV Vive, Valve Index
Software Arch Linux
Benchmark Scores 31 FPS in Dalaran
Heart of the Swarm won't be out until 2012 and yes, it counts as a major release.

Diablo III should be out this year, but ActiBlizz is just covering their asses with investors saying that there will be 2 releases from Blizzard Entertainment next year if there isn't one this year.
 
Joined
Sep 1, 2009
Messages
1,182 (0.22/day)
Location
CO
System Name 4k
Processor AMD 5800x3D
Motherboard MSI MAG b550m Mortar Wifi
Cooling Corsair H100i
Memory 4x8Gb Crucial Ballistix 3600 CL16 bl8g36c16u4b.m8fe1
Video Card(s) Nvidia Reference 3080Ti
Storage ADATA XPG SX8200 Pro 1TB
Display(s) LG 48" C1
Case CORSAIR Carbide AIR 240 Micro-ATX
Audio Device(s) Asus Xonar STX
Power Supply EVGA SuperNOVA 650W
Software Microsoft Windows10 Pro x64
dungeon siege 3 here i come then.
 
Joined
Jul 14, 2009
Messages
913 (0.17/day)
Location
Baltimore, MD
System Name Cool Runnings Mark 2
Processor i7 4770k No OC
Motherboard MSI Z87 MPower
Cooling Noctua NH-D14
Memory GSkill TridentX 2400MHz 32GB
Video Card(s) MSI GTX 1070 Ti Duke, EVGA GTX 780 AC+
Storage Crucial MX500 1TB SSD, 3 more HDDs
Display(s) 2x MSI 32" 2560 x 1440 144Hz Optix MAG321CQR, Acer G276HLDbd Black 27" 6ms
Case Corsair 600t
Power Supply Corsair HX850
Mouse Razer DeathAdder
Keyboard Steelseries Merc Stealth
Software Win10 Pro 64-bit
Heart of the Swarm won't be out until 2012 and yes, it counts as a major release.

Diablo III should be out this year, but ActiBlizz is just covering their asses with investors saying that there will be 2 releases from Blizzard Entertainment next year if there isn't one this year.

wtf? a 2 year delay? if we assume there is anoyher 2 year delay for the protoss campaign, then each expansion better have some MAJOR improvements and not nbe the same old game for 4 years.

now dont get me wrong, i LOVED what they did with the campaign system, with such a long time between expansions though i do expect some improvement and change.
 

Fourstaff

Moderator
Staff member
Joined
Nov 29, 2009
Messages
10,020 (1.91/day)
Location
Home
System Name Orange! // ItchyHands
Processor 3570K // 10400F
Motherboard ASRock z77 Extreme4 // TUF Gaming B460M-Plus
Cooling Stock // Stock
Memory 2x4Gb 1600Mhz CL9 Corsair XMS3 // 2x8Gb 3200 Mhz XPG D41
Video Card(s) Sapphire Nitro+ RX 570 // Asus TUF RTX 2070
Storage Samsung 840 250Gb // SX8200 480GB
Display(s) LG 22EA53VQ // Philips 275M QHD
Case NZXT Phantom 410 Black/Orange // Tecware Forge M
Power Supply Corsair CXM500w // CM MWE 600w
Better polished than early. I don't mind them not releasing Heart of the Swarm at all, so long as they keep on bringing new maps to the ladder and also continue to balance the game. Heard they said that HotS is going to be priced as an expansion.
 
Joined
Mar 31, 2007
Messages
1,895 (0.30/day)
Location
ontario canada
System Name home brew
Processor Intel Corei7 3770K OC @ 4.5Ghz
Motherboard ASUS P8Z77-V
Cooling Corsair H100
Memory 16GB DDR3 1600 GSKILL
Video Card(s) Powercolor Radeon 7970, MSI Radeon 7970
Storage Mushkin Chronos Deluxe 240gb. 2 TB Hdd.
Display(s) 3x24inch Dell Ultra IPS
Case CM storm trooper
Power Supply Antec Quattro OC ed. 1200w
Software Windows 7 Business x64
Benchmark Scores vantage: P43089
Devs said roughly 18 months for heart of the swarm after SC2 released. So early 2012. But it could release this year, yah never know.

Also didnt know tony hawk got canned along with guitar hero. Frankly it deserved it even a bit more than guitar hero.
 

Kreij

Senior Monkey Moderator
Joined
Feb 6, 2007
Messages
13,817 (2.20/day)
Location
Cheeseland (Wisconsin, USA)
from link said:
"We think that in the long run, Blizzard is good for one major new release a year," Tippl said. "But of course, what always rules is that the quality of the game has to be there."

I can just hear the CFO and COO at Activision gnashing their teeth because they can't make Blizzard hurry things up to appease the shareholders. :laugh:

I'm looking forward to D3, but I would rather have a Blizzard ready game than an Activision ready game, if you get my drift.
 
Top