• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

GLOBALFOUNDRIES Extending Fab 8 to Meet Strong Customer Demand

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
46,356 (7.68/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
GLOBALFOUNDRIES today announced it is moving forward with the final construction for the extension of Module 1 at the Fab 8 campus in New York. The project will add 90,000 square feet of manufacturing capacity, bringing the total capacity for Fab 8 Module 1 to 300,000 square feet. Construction activities are scheduled to begin in August and work is expected to be completed in December 2013.

"During the construction of Fab 8, we extended the shell of the Module 1 building with the expectation that our business would continue to grow. Today we see increasingly strong demand from our customers, especially at the 28nm node, and we are excited to be moving forward with this next phase in the development of the Fab 8 campus," said Eric Choh, vice president and general manager, Fab 8, GLOBALFOUNDRIES. "By continuing to expand our investment in the project, GLOBALFOUNDRIES is delivering more options to our global customers, while helping to redefine upstate New York as a premier hub of the global semiconductor industry, creating thousands of new advanced manufacturing jobs, and contributing billions of dollars to the regional economy."

Consisting of approximately two million square feet, Fab 8 is being developed as the world's most advanced semiconductor foundry manufacturing facility and is consistently hitting all major development milestones. GLOBALFOUNDRIES began construction on Fab 8 in July 2009 and began moving people and equipment into the facility in mid-2011. Initial wafer starts began earlier this year and the facility is on track to begin risk production by the end of the year, with volume production in early 2013.

Extending the Fab 8 cleanroom is expected to increase the Fab 8 capacity to approximately 60,000 wafers per month and increase the capital budget by approximately $2.3 billion, taking the total capital budget from $4.6 billion to approximately $6.9 billion, once tools and equipment are installed.

Since breaking ground on Fab 8 in 2009, GLOBALFOUNDRIES has created more than 1,500 new direct jobs, developing a unique and diverse workforce drawn from local talent in the region as well as experienced professionals from across the United States and more than 30 countries.

In addition, the project has created an additional 4,300 construction-related jobs and established the largest private Project Labor Agreement in history, generating hundreds of millions of dollars of economic development throughout upstate New York during the worst economic downturn since the Great Depression.

GLOBALFOUNDRIES has a total of about 1,800 employees across New York, including research teams at the IBM facilities in East Fishkill and at CNSE at the University of Albany, and more than 12,000 employees worldwide with additional manufacturing campuses in Germany and Singapore.

View at TechPowerUp Main Site
 
Joined
May 22, 2010
Messages
2,516 (0.50/day)
Location
Canada
System Name m1dg3t | DeathBox | HairPi 3
Processor 3570k @ 4.0 1.15v BIOS | q9550 @ 3.77 1.325v BIOS
Motherboard Asrock z77e iTX | p5q Dlx 2301 BIOS
Cooling Custom Water | D-14 & HR-03gt | Passive HSF
Memory Samsung MV-3V4G3D 4g x 2 @ 1866 1.35v | OcZ RpR 2g x 4 @ 1067 2.2v
Video Card(s) MSi 7950 tf3 @1000 / 1350 | Asus 5870 V2 @ 900 / 1275
Storage Adata sx900 256Gb / WD 2500 HHTZ | WD 1001 FALS x 2
Display(s) BenQ gw2750hm | 46" Sharp Quatron
Case BitFenix Prodigy - m0dd3d | Antec Fusion Remote MAX
Audio Device(s) Onboard Toslink > Yamaha HTR 6290 | Xonar HDAV1.3 > Yamaha DSP z7
Power Supply Ocz mXp700w | Ocz zx850w | Cannakit 5v 2.5a
Mouse Logitech G700s | Logitech G9x - Cable Repaired
Keyboard TT Meka G1 - Black w Cherry Blacks| Logitech G11
Software Win7 Home | Xp sp3 & Vista ultimate | Raspbian
Benchmark Scores Epeen!! Who needs epeen??
Awesome! This only means good things for end users :)
 
Joined
May 21, 2008
Messages
4,113 (0.71/day)
Location
Iowa, USA
System Name THE CUBE 2.0
Processor Intel i5 13600k
Motherboard MSI MPG Z690 EDGE DDR4
Cooling Phanteks PH-TC14PE BK 2x T30-120 Fan mod mount
Memory G.Skill TridentZ 3200 MT/s C15 32GB 2x16GB
Video Card(s) Gigabyte Aorus 1080 Ti 11GB OC: Core 2GHz, Mem 5.7GHz
Storage WD SN770 250GB / 3x WD SN850X 2TB / Toshiba X300 4TB / 2x RAID1 Toshiba P300 3TB
Display(s) Samsung 49" Odyssey OLED G95SC 240Hz 5120 x 1440
Case "THE CUBE" Custom built, pure Red Alder wood
Audio Device(s) Beyerdynamic DT 880
Power Supply Corsair RM1000X
Mouse Logitech G700
Keyboard Logitech G910
Software Windows 11 Pro
Great news, but to bad its Upstate New York they already have lots of money :p
 
Top