• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

Post your CrystalDiskMark speeds

sgt.8nemi

New Member
Joined
Dec 4, 2023
Messages
4 (0.01/day)
Intel P3600 u.2 nvme ssd (2016) single (i also have two for raid0 but it is not in the main pc)
Very cool and it has 4300TBW endurance
View attachment 272470

And my Samsung PM9A1 1tb nvme faster but it is hot as hell even with the biggest heatsink.

View attachment 272473

And my Hdd HGST 6tb 7200rpm 128mb cache (Dell H310 modded 9211-8i P19)

View attachment 272518
How can you install it ?
I have Lenovo S30 and i didn't found any tutorials
(Intel dc p3600)
 
Joined
Jul 15, 2019
Messages
539 (0.28/day)
Location
Hungary
System Name Detox sleeper
Processor Intel i9-7980XE@4,5Ghz
Motherboard Asrock x299 Taichi XE (custom bios with ecc reg support, old microcode)
Cooling Custom water: Alphacool XT45 1080 + 9xArctic P12, EK-D5 pump combo, EK Velocity D-RGB block
Memory 8x16Gb Hynix DJR ECC REG 3200@4000
Video Card(s) Nvidia RTX 3080 FE 10Gb undervolted
Storage Samsung PM9A1 1Tb + PM981 512Gb + Kingston HyperX 480Gb + Samsung Evo 860 500Gb
Display(s) HP ZR30W (30" 2560x1600 10 bit)
Case Chieftec 1E0-500A-CT04 + AMD Sempron sticker
Audio Device(s) Genius Cavimanus
Power Supply Super Flower Leadex 750w Platinum
Mouse Logitech G400
Keyboard IBM Model M122 (boltmod, micro pro usbc)
Software Windows 11 Pro x64
How can you install it ?
I have Lenovo S30 and i didn't found any tutorials
(Intel dc p3600)
It was in a u.2 to pcie adapter, works like a standard nvme drive. I only use as a secondary drive, not booting OS. It is not a sata/sas drive.
 
Joined
Aug 29, 2016
Messages
68 (0.02/day)
Processor AMD Ryzen 7 5800X3D
Motherboard ASUS ROG CROSSHAIR VII HERO (WI-FI)
Cooling DEEPCOOL ASSASSIN III
Memory 2x8GB Patriot Viper Steel 3800MHz CL14
Video Card(s) RTX 2080 Ti (2055/1925) / WITH RAIJINTEK MORPHEUS
Storage SM961 512GB / 850PRO 250GB / Hitachi 1TB / 2x WD 8TB
Display(s) MAG251RX / AOC 24G2U / VX2458-MHD
Case Fractal Design Define S
Audio Device(s) beyerdynamic DT 900 PRO X
Power Supply Super Flower Leadex Platinum 1200W
Mouse Razer Deathadder V3
Keyboard IKBC MF87 Pro
Software Windows 10
Samsung 970 PRO 1 TB NVME SSD without a heatsink. One day I will add heatsinks on controller/ram and post results again if they are different by a wide margin.

DiskMark64_MLX6YS5uCR.png
 

sgt.8nemi

New Member
Joined
Dec 4, 2023
Messages
4 (0.01/day)
It was in a u.2 to pcie adapter, works like a standard nvme drive. I only use as a secondary drive, not booting OS. It is not a sata/sas drive.
i want to use it as a secndary driver too but i don't know how to ro s3 and windows 10 pro gost specture edition
 
Joined
Mar 7, 2023
Messages
798 (1.41/day)
System Name BarnacleMan
Processor 14700KF
Motherboard Gigabyte B760 Aorus Elite Ax DDR5
Cooling ARCTIC Liquid Freezer II 240 + P12 Max Fans
Memory 32GB Kingston Fury Beast
Video Card(s) Asus Tuf 4090 24GB
Storage 4TB sn850x, 2TB sn850x, 2TB Netac Nv7000 + 2TB p5 plus, 4TB MX500 * 2 = 18TB. Plus dvd burner.
Display(s) Dell 23.5" 1440P IPS panel
Case Lian Li LANCOOL II MESH Performance Mid-Tower
Audio Device(s) Logitech Z623
Power Supply Gigabyte 850w
1719456925607.png


This is a raid 0 of two 4TB sn850xs. Probably nothing too crazy to those with gen 5. Buts crazy to me. It was able to duplicate a 40GB folder without even a dialogue box popping up. It was like it was instant. But no... I wont keep in raid 0, as tempting as it is.
 
Joined
Sep 13, 2022
Messages
199 (0.27/day)
System Name Xpectra
Processor Intel Core i3 10105F
Motherboard Asrock H470M-HDV
Cooling Cooler Master H410R RGB
Memory Hynix 16GB (2x8) 2666Mhz DDR4 RAM
Video Card(s) Zotac GTX 1050 Ti Mini
Storage Crucial BX500 120GB+480GB, 1TB+2TB Seagate Barracuda 7200RPM
Display(s) HP 22es
Case Chiptronex C100
Audio Device(s) F&D F190X
Power Supply Corsair CX550
Mouse Redragon Phaser M609
Keyboard TVS EGold Bharat
Software Windows 10 x64
my bx500 boot drive still going strong after 5 years
boot drive speedtest.jpg
game drive.jpg
 
Top