• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

U.S. Government Shutdown Hits Several CES Exhibitors Hard

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
46,356 (7.68/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
The ongoing 2018-19 U.S. Government Shutdown has had a direct impact on CES 2019, with many exhibitors, including American companies, rendered unable to execute their CES strategies for the year. Several companies we interacted with today, with whom we had scheduled appointments weeks ahead to visit their showfloor or private-suite exhibitions, either had nothing to show us (substituted in the last minute with existing products bought off stores), or they had far fewer exhibits than they expected to put out.

The U.S. Government shutdown has caused severe delays in U.S. Customs and Border Protection clearing imports of CES exhibit samples and prototypes, even for American companies trying to get their unreleased product prototypes into the country from offshore manufacturing sites across Asia. SeaSonic USA, a respectable power supply manufacturer, was completely stripped of samples, with all their exhibits held up in customs. Some companies like Alphacool managed to get some of their exhibits through well in time. We're hearing similar horror-stories from several manufacturers.

View at TechPowerUp Main Site
 
Joined
Apr 30, 2012
Messages
3,881 (0.89/day)
So waiting for the last minute to import is a horror story. More like bad planning. Should have shipped your display products before christmas

I just find it funny these companies can book a booth or a suite months in advance but importing their products in a timely manner is so hard.
 
Last edited:

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
46,356 (7.68/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
So waiting for the last minute to import is a horror story. More like bad planning. Should have shipped your display products before christmas

I just find it funny these companies can book a booth or a suite months in advance but importing their products in a timely manner is so hard.

They shipped their stuff around the same dates they've been shipping for the past three decades. In fact past editions of CES were closer to Xmas/NY than this year's edition.

You can book a hotel suite well in advance, but there must be someone in Vegas to receive and hold onto your stuff without leaking it.
 
Joined
Nov 4, 2005
Messages
11,681 (1.73/day)
System Name Compy 386
Processor 7800X3D
Motherboard Asus
Cooling Air for now.....
Memory 64 GB DDR5 6400Mhz
Video Card(s) 7900XTX 310 Merc
Storage Samsung 990 2TB, 2 SP 2TB SSDs and over 10TB spinning
Display(s) 56" Samsung 4K HDR
Audio Device(s) ATI HDMI
Mouse Logitech MX518
Keyboard Razer
Software A lot.
Benchmark Scores Its fast. Enough.
So waiting for the last minute to import is a horror story. More like bad planning. Should have shipped your display products before christmas

I just find it funny these companies can book a booth or a suite months in advance but importing their products in a timely manner is so hard.


As a vendor required to do booth setup its not that easy, and I imagine its that much more difficult with a fast paced product like consumer electronics, where the final design may not be known until a few weeks before the event. We usually book after the show ends so we are booked for next year, and we usually end up with a 3 month time line which gets changed numerous times, and then once things are in its a dance with the carpets, electrical, table and chairs, etc....

Its not that easy.
 
Joined
Apr 30, 2012
Messages
3,881 (0.89/day)
They shipped their stuff around the same dates they've been shipping for the past three decades. In fact past editions of CES were closer to Xmas/NY than this year's edition.

You can book a hotel suite well in advance, but there must be someone in Vegas to receive and hold onto your stuff without leaking it.

As much as i like me some SeaSonic PSUs. They have a office in California about 1hr away from Las Vegas. How hard would it have been for them to ship it there and have it held if need be.

As a vendor required to do booth setup its not that easy, and I imagine its that much more difficult with a fast paced product like consumer electronics, where the final design may not be known until a few weeks before the event. We usually book after the show ends so we are booked for next year, and we usually end up with a 3 month time line which gets changed numerous times, and then once things are in its a dance with the carpets, electrical, table and chairs, etc....

Its not that easy.

CES doesnt change. Once they announce dates bookings submissions are available. your submitting for a known date. If the product isnt finished or failed to get there on time how is it anyone elses fault.

I can understand the added time to import but that still comes down to poor planning. Its not like there wasn't a lead up to a possible government draw down for weeks.
 
Last edited:
Joined
Aug 20, 2007
Messages
20,763 (3.41/day)
System Name Pioneer
Processor Ryzen R9 7950X
Motherboard GIGABYTE Aorus Elite X670 AX
Cooling Noctua NH-D15 + A whole lotta Sunon and Corsair Maglev blower fans...
Memory 64GB (4x 16GB) G.Skill Flare X5 @ DDR5-6000 CL30
Video Card(s) XFX RX 7900 XTX Speedster Merc 310
Storage 2x Crucial P5 Plus 2TB PCIe 4.0 NVMe SSDs
Display(s) 55" LG 55" B9 OLED 4K Display
Case Thermaltake Core X31
Audio Device(s) TOSLINK->Schiit Modi MB->Asgard 2 DAC Amp->AKG Pro K712 Headphones or HDMI->B9 OLED
Power Supply FSP Hydro Ti Pro 850W
Mouse Logitech G305 Lightspeed Wireless
Keyboard WASD Code v3 with Cherry Green keyswitches + PBT DS keycaps
Software Gentoo Linux x64
CES doesnt change.

Indeed, only politics do. The shutdown has several things running at a snails pace this year. That's not a political comment as i'm not levying blame to either side, it just does.

God help you if you ever have to travel through SeaTac during a shutdown, for example.
 
Joined
Apr 30, 2012
Messages
3,881 (0.89/day)
Indeed, only politics do. The shutdown has several things running at a snails pace this year. That's not a political comment as i'm not levying blame to either side, it just does.

God help you if you ever have to travel through SeaTac during a shutdown, for example.

It started Dec 22 though. If your importing after that your already cutting it close to the opening not to mention the lead up.
 

FordGT90Concept

"I go fast!1!11!1!"
Joined
Oct 13, 2008
Messages
26,259 (4.63/day)
Location
IA, USA
System Name BY-2021
Processor AMD Ryzen 7 5800X (65w eco profile)
Motherboard MSI B550 Gaming Plus
Cooling Scythe Mugen (rev 5)
Memory 2 x Kingston HyperX DDR4-3200 32 GiB
Video Card(s) AMD Radeon RX 7900 XT
Storage Samsung 980 Pro, Seagate Exos X20 TB 7200 RPM
Display(s) Nixeus NX-EDG274K (3840x2160@144 DP) + Samsung SyncMaster 906BW (1440x900@60 HDMI-DVI)
Case Coolermaster HAF 932 w/ USB 3.0 5.25" bay + USB 3.2 (A+C) 3.5" bay
Audio Device(s) Realtek ALC1150, Micca OriGen+
Power Supply Enermax Platimax 850w
Mouse Nixeus REVEL-X
Keyboard Tesoro Excalibur
Software Windows 10 Home 64-bit
Benchmark Scores Faster than the tortoise; slower than the hare.
Joined
Aug 20, 2007
Messages
20,763 (3.41/day)
System Name Pioneer
Processor Ryzen R9 7950X
Motherboard GIGABYTE Aorus Elite X670 AX
Cooling Noctua NH-D15 + A whole lotta Sunon and Corsair Maglev blower fans...
Memory 64GB (4x 16GB) G.Skill Flare X5 @ DDR5-6000 CL30
Video Card(s) XFX RX 7900 XTX Speedster Merc 310
Storage 2x Crucial P5 Plus 2TB PCIe 4.0 NVMe SSDs
Display(s) 55" LG 55" B9 OLED 4K Display
Case Thermaltake Core X31
Audio Device(s) TOSLINK->Schiit Modi MB->Asgard 2 DAC Amp->AKG Pro K712 Headphones or HDMI->B9 OLED
Power Supply FSP Hydro Ti Pro 850W
Mouse Logitech G305 Lightspeed Wireless
Keyboard WASD Code v3 with Cherry Green keyswitches + PBT DS keycaps
Software Gentoo Linux x64
It started Dec 22 though. If your importing after that your already cutting it close to the opening not to mention the lead up.

True, I'll grant that. But cutting it close often gives more prep time to prepare a product. Without knowing the full extent of reasons, I'd be hessitant to pull the "stupid" card.
 
Joined
Feb 18, 2005
Messages
5,238 (0.75/day)
Location
Ikenai borderline!
System Name Firelance.
Processor Threadripper 3960X
Motherboard ROG Strix TRX40-E Gaming
Cooling IceGem 360 + 6x Arctic Cooling P12
Memory 8x 16GB Patriot Viper DDR4-3200 CL16
Video Card(s) MSI GeForce RTX 4060 Ti Ventus 2X OC
Storage 2TB WD SN850X (boot), 4TB Crucial P3 (data)
Display(s) 3x AOC Q32E2N (32" 2560x1440 75Hz)
Case Enthoo Pro II Server Edition (Closed Panel) + 6 fans
Power Supply Fractal Design Ion+ 2 Platinum 760W
Mouse Logitech G602
Keyboard Logitech G613
Software Windows 10 Professional x64
If the product isnt finished or failed to get there on time how is it anyone elses fault.

Cool, so Amazon should do away with shipping dates for products and just say "it'll get to you when it gets to you lol".

How do you think that would affect everyone who has to plan to be available to handle those products through the various stages of delivery?

Cripes, your "argument" is so moronic it barely even merits replying to.
 
Joined
Aug 20, 2007
Messages
20,763 (3.41/day)
System Name Pioneer
Processor Ryzen R9 7950X
Motherboard GIGABYTE Aorus Elite X670 AX
Cooling Noctua NH-D15 + A whole lotta Sunon and Corsair Maglev blower fans...
Memory 64GB (4x 16GB) G.Skill Flare X5 @ DDR5-6000 CL30
Video Card(s) XFX RX 7900 XTX Speedster Merc 310
Storage 2x Crucial P5 Plus 2TB PCIe 4.0 NVMe SSDs
Display(s) 55" LG 55" B9 OLED 4K Display
Case Thermaltake Core X31
Audio Device(s) TOSLINK->Schiit Modi MB->Asgard 2 DAC Amp->AKG Pro K712 Headphones or HDMI->B9 OLED
Power Supply FSP Hydro Ti Pro 850W
Mouse Logitech G305 Lightspeed Wireless
Keyboard WASD Code v3 with Cherry Green keyswitches + PBT DS keycaps
Software Gentoo Linux x64
Honestly, I feel it was pretty stupid. All you need to do is watch an episode of "The Aprentice" and you'd know a shutdown for as long as he can was inevitable at the first sign of conflict.
 
Last edited by a moderator:

TheLostSwede

News Editor
Joined
Nov 11, 2004
Messages
16,055 (2.26/day)
Location
Sweden
System Name Overlord Mk MLI
Processor AMD Ryzen 7 7800X3D
Motherboard Gigabyte X670E Aorus Master
Cooling Noctua NH-D15 SE with offsets
Memory 32GB Team T-Create Expert DDR5 6000 MHz @ CL30-34-34-68
Video Card(s) Gainward GeForce RTX 4080 Phantom GS
Storage 1TB Solidigm P44 Pro, 2 TB Corsair MP600 Pro, 2TB Kingston KC3000
Display(s) Acer XV272K LVbmiipruzx 4K@160Hz
Case Fractal Design Torrent Compact
Audio Device(s) Corsair Virtuoso SE
Power Supply be quiet! Pure Power 12 M 850 W
Mouse Logitech G502 Lightspeed
Keyboard Corsair K70 Max
Software Windows 10 Pro
Benchmark Scores https://valid.x86.fr/5za05v
So waiting for the last minute to import is a horror story. More like bad planning. Should have shipped your display products before christmas

I just find it funny these companies can book a booth or a suite months in advance but importing their products in a timely manner is so hard.

Sounds like you've done a lot of trade shows, not...
You clearly have no idea how it works with shipping and receiving goods even.
Trade shows have VERY strict shipping times and the goods can't arrive before the set deadlines, or it's not accepted.
If you ship to a hotel, you can only ship it there a few days before you arrive and they charge mega bucks in the US for you to receive packages there, as they charge a percentage of the value of the package.
So no, this is not bad planning, it's limitations imposed by the trade shows.
 
Low quality post by Assimilator
Joined
Feb 18, 2005
Messages
5,238 (0.75/day)
Location
Ikenai borderline!
System Name Firelance.
Processor Threadripper 3960X
Motherboard ROG Strix TRX40-E Gaming
Cooling IceGem 360 + 6x Arctic Cooling P12
Memory 8x 16GB Patriot Viper DDR4-3200 CL16
Video Card(s) MSI GeForce RTX 4060 Ti Ventus 2X OC
Storage 2TB WD SN850X (boot), 4TB Crucial P3 (data)
Display(s) 3x AOC Q32E2N (32" 2560x1440 75Hz)
Case Enthoo Pro II Server Edition (Closed Panel) + 6 fans
Power Supply Fractal Design Ion+ 2 Platinum 760W
Mouse Logitech G602
Keyboard Logitech G613
Software Windows 10 Professional x64
Sounds like you've done a lot of trade shows, not...
You clearly have no idea how it works with shipping and receiving goods even.
Trade shows have VERY strict shipping times and the goods can't arrive before the set deadlines, or it's not accepted.
If you ship to a hotel, you can only ship it there a few days before you arrive and they charge mega bucks in the US for you to receive packages there, as they charge a percentage of the value of the package.
So no, this is not bad planning, it's limitations imposed by the trade shows.

What do you expect from Trump supporters, aka the party of anti-experts who assume that their lack of knowledge about anything actually means they know everything?
 
Joined
Apr 30, 2012
Messages
3,881 (0.89/day)
Sounds like you've done a lot of trade shows, not...
You clearly have no idea how it works with shipping and receiving goods even.
Trade shows have VERY strict shipping times and the goods can't arrive before the set deadlines, or it's not accepted.
If you ship to a hotel, you can only ship it there a few days before you arrive and they charge mega bucks in the US for you to receive packages there, as they charge a percentage of the value of the package.
So no, this is not bad planning, it's limitations imposed by the trade shows.

The only company named has a office less then 2hr away (with traffic) that could receive such items. That office would have been aware of any additional delays to the chain.

Looks pretty spacious.


Heck they could have just walked to the DHS booth #1401 where U.S. Customs reps are there. I'm sure he would have looked around and said, Others don't seam to have that problem.
 

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
46,356 (7.68/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
The only company named has a office less then 2hr away (with traffic) that could receive such items. That office would have been aware of any additional delays to the chain.

Looks pretty spacious.


Heck they could have just walked to the DHS booth #1401 where U.S. Customs reps are there. I'm sure he would have looked around and said, Others don't seam to have that problem.
As someone else mentioned, tradeshow prototypes are developed and refined upto mere hours before a trade-show. Remember those motherboards with shunt wires sticking out and no heatsinks? Nobody would waste time putting them around in a local R&D facility when the prototyping is done at an offshore factory. Companies who have been exhibiting for the past 3 decades and who intend to sell their products to both liberals and conservatives, would never blame their CES problems on an ongoing political shitshow. Except when that is the truth.
 
Joined
Apr 30, 2012
Messages
3,881 (0.89/day)
As someone else mentioned, tradeshow prototypes are developed and refined upto mere hours before a trade-show. Remember those motherboards with shunt wires sticking out and no heatsinks? Nobody would waste time putting them around in a local R&D facility when the prototyping is done at an offshore factory. Companies who have been exhibiting for the past 3 decades and who intend to sell their products to both liberals and conservatives, would never blame their CES problems on an ongoing political shitshow. Except when that is the truth.

I'm just failing to see how only certain company have issues. You just named Seasonic which is based in taiwan but so are so many others that presented there and some are giving Keynotes. Why isnt affecting those who likely have the biggest displays and exhibits along with amount of vast products to showcase.

If you look at CES 2019 exhibitors "Seasonic" is not there. Neither is Alphacool. Which brings up the question. If they aren't officially part of CES 2019 how can the story or headline be correct ?
 
Last edited:
Joined
Oct 8, 2014
Messages
120 (0.03/day)
As the delay became obvious, why couldn't they just put a few) people on a plane, with their xx number of prototypes, shipping from place of manufacture, to the location of CES?

A few plane tickets, with excess baggage isn't that much if you have to have something there in time, and normal methods aren't working.
 

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
46,356 (7.68/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
As the delay became obvious, why couldn't they just put a few) people on a plane, with their xx number of prototypes, shipping from place of manufacture, to the location of CES?

A few plane tickets, with excess baggage isn't that much if you have to have something there in time, and normal methods aren't working.

Bringing unreleased/unfamiliar electronics into the US with you isn't easy. You must go through red channel and get quizzed for hours, after waiting for hours more, despite import papers. Especially in Vegas, a lot of dumbasses bring excess cash/bullion/gems, etc. It's a busy customs area. Companies don't want to put their employees (especially higherups in marketing) through this. They ship it across Fedex/UPS overnighters at whatever cost, while there's someone at Vegas to receive it.
 

FordGT90Concept

"I go fast!1!11!1!"
Joined
Oct 13, 2008
Messages
26,259 (4.63/day)
Location
IA, USA
System Name BY-2021
Processor AMD Ryzen 7 5800X (65w eco profile)
Motherboard MSI B550 Gaming Plus
Cooling Scythe Mugen (rev 5)
Memory 2 x Kingston HyperX DDR4-3200 32 GiB
Video Card(s) AMD Radeon RX 7900 XT
Storage Samsung 980 Pro, Seagate Exos X20 TB 7200 RPM
Display(s) Nixeus NX-EDG274K (3840x2160@144 DP) + Samsung SyncMaster 906BW (1440x900@60 HDMI-DVI)
Case Coolermaster HAF 932 w/ USB 3.0 5.25" bay + USB 3.2 (A+C) 3.5" bay
Audio Device(s) Realtek ALC1150, Micca OriGen+
Power Supply Enermax Platimax 850w
Mouse Nixeus REVEL-X
Keyboard Tesoro Excalibur
Software Windows 10 Home 64-bit
Benchmark Scores Faster than the tortoise; slower than the hare.
They ship it across Fedex/UPS overnighters at whatever cost, while there's someone at Vegas to receive it.
That's always Russian Roulette in terms of getting screened by customs and they know that. They took a gamble on their packages not getting screened and lost.

Customs workers are still required to show up for work but they're doing so without pay (presumably will get backpay when the shutdown ends). I can't find any source that says customs screening of packages has been affected in anyway. I smell a scapegoat.
 

alexander brett

New Member
Joined
Aug 31, 2018
Messages
22 (0.01/day)
Location
Colorado
Sounds like you've done a lot of trade shows, not...
You clearly have no idea how it works with shipping and receiving goods even.
Trade shows have VERY strict shipping times and the goods can't arrive before the set deadlines, or it's not accepted.
If you ship to a hotel, you can only ship it there a few days before you arrive and they charge mega bucks in the US for you to receive packages there, as they charge a percentage of the value of the package.
So no, this is not bad planning, it's limitations imposed by the trade shows.

Most commenters on any internet forum know almost nothing about anything other than the specs of their computer and what the inside of their hovel looks like.

land of the free, home for the brave uh, "Good luck, America! You're on your own! "George Carlin

Word. (for non-Americans "Word." means damn straight, true dat, amen, yup yup, mmhmm.
 
Last edited:
Joined
Apr 30, 2012
Messages
3,881 (0.89/day)
Most commenters on any internet forum know almost nothing about anything other than the specs of their computer and what the inside of their hovel looks like.

Yup. Like being part of CES. The Mirage Hotel Suite where these companies named are located and hosting media isn't part of CES.

You can check CES website for all the exhibitors and their locations.
 
Top