• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.
  • The forums have been upgraded with support for dark mode. By default it will follow the setting on your system/browser. You may override it by scrolling to the end of the page and clicking the gears icon.

Intel Core Ultra "Panther Lake" Processor Hands-on and Up Close at Computex 2025

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
47,738 (7.42/day)
Location
Dublin, Ireland
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard Gigabyte B550 AORUS Elite V2
Cooling DeepCool Gammax L240 V2
Memory 2x 16GB DDR4-3200
Video Card(s) Galax RTX 4070 Ti EX
Storage Samsung 990 1TB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
Intel at the 2025 Computex showed off its next-generation Core Ultra Series 3 processor, codenamed "Panther Lake." The mobile H-segment version of the chip comes with a slender rectangular package similar to "Arrow Lake-H" and "Meteor Lake." It is a tile-based disaggregated processor, but comes in a unique arrangement of tiles we haven't seen with the past two generations. The chip is dominated by two large tiles, one is very likely the Graphics + SoC tile, the smaller of the two being the Compute tile with the CPU cores, and the slender rectangular tiles being related to I/O.

As for IP, "Panther Lake" introduces a new generation iGPU powered by the Xe3 "Celestial" graphics architecture. The CPU complex consists of "Cougar Cove" P-cores, and "Darkmont" E-cores, both of which are expected to provide generational IPC improvements over the current "Lion Cove" and "Skymont." At Computex, we not only got to go hands-on with the mobile packages of "Panther Lake," but also see the chip in action, installed on a testing and platform validation system. The engineering goal with "Panther Lake," Intel says, is to offer efficiency similar to "Lunar Lake," but with performance generationally exceeding "Arrow Lake-H." The Compute tile is expected to be built on the new Intel 18A foundry node. Intel says "Panther Lake" is on track for mass-production in the second half of 2025, with the first consumer products expected at CES 2026.



View at TechPowerUp Main Site
 
Back
Top