• Welcome to TechPowerUp Forums, Guest! Please check out our forum guidelines for info related to our community.

AMD and GlobalFoundries Renew Wafer Supply Agreement

btarunr

Editor & Senior Moderator
Staff member
Joined
Oct 9, 2007
Messages
46,393 (7.67/day)
Location
Hyderabad, India
System Name RBMK-1000
Processor AMD Ryzen 7 5700G
Motherboard ASUS ROG Strix B450-E Gaming
Cooling DeepCool Gammax L240 V2
Memory 2x 8GB G.Skill Sniper X
Video Card(s) Palit GeForce RTX 2080 SUPER GameRock
Storage Western Digital Black NVMe 512GB
Display(s) BenQ 1440p 60 Hz 27-inch
Case Corsair Carbide 100R
Audio Device(s) ASUS SupremeFX S1220A
Power Supply Cooler Master MWE Gold 650W
Mouse ASUS ROG Strix Impact
Keyboard Gamdias Hermes E2
Software Windows 11 Pro
AMD in its 8-K filing with the SEC, disclosed that it has updated its wafer supply agreement (WSA) with GlobalFoundries. Under the latest agreement, AMD commits to buy $2.1 billion worth wafers from GlobalFoundries between 2022 and 2025. The previous version of the WSA saw commitments up to 2024, and wafers worth $1.6 billion. The update hence adds another year and $500 million worth supply.

AMD currently sources 12 nm and 14 nm wafers from GlobalFoundries, which go into making cIOD and sIOD components in its processors, and motherboard chipsets. The move to extend the WSA indicates that the company may continue to use 12 nm-class I/O dies in its processors for the foreseeable future. It will be very interesting to see if 12 nm-class I/O dies make it to next-generation products such as "Genoa" and "Rapael," which integrate the latest IP blocks such as PCI-Express Gen 5 root-complexes, DDR5 memory controllers, and 3rd Gen Infinity Fabric. Processors with 12 nm I/O dies, such as "Milan" and "Vermeer" could be retired only by 2023-24, as AMD will use 2022 to spread across its next-gen product launches.



View at TechPowerUp Main Site
 
Joined
Sep 6, 2013
Messages
2,979 (0.77/day)
Location
Athens, Greece
System Name 3 desktop systems: Gaming / Internet / HTPC
Processor Ryzen 5 5500 / Ryzen 5 4600G / FX 6300 (12 years latter got to see how bad Bulldozer is)
Motherboard MSI X470 Gaming Plus Max (1) / MSI X470 Gaming Plus Max (2) / Gigabyte GA-990XA-UD3
Cooling Νoctua U12S / Segotep T4 / Snowman M-T6
Memory 16GB G.Skill RIPJAWS 3600 / 16GB G.Skill Aegis 3200 / 16GB Kingston 2400MHz (DDR3)
Video Card(s) ASRock RX 6600 + GT 710 (PhysX)/ Vega 7 integrated / Radeon RX 580
Storage NVMes, NVMes everywhere / NVMes, more NVMes / Various storage, SATA SSD mostly
Display(s) Philips 43PUS8857/12 UHD TV (120Hz, HDR, FreeSync Premium) ---- 19'' HP monitor + BlitzWolf BW-V5
Case Sharkoon Rebel 12 / Sharkoon Rebel 9 / Xigmatek Midguard
Audio Device(s) onboard
Power Supply Chieftec 850W / Silver Power 400W / Sharkoon 650W
Mouse CoolerMaster Devastator III Plus / Coolermaster Devastator / Logitech
Keyboard CoolerMaster Devastator III Plus / Coolermaster Devastator / Logitech
Software Windows 10 / Windows 10 / Windows 7
Pity they don't want/can't use GF's 12nm for much more CPUs and GPUs this period of time.
 
Joined
Jul 16, 2014
Messages
8,119 (2.27/day)
Location
SE Michigan
System Name Dumbass
Processor AMD Ryzen 7800X3D
Motherboard ASUS TUF gaming B650
Cooling Artic Liquid Freezer 2 - 420mm
Memory G.Skill Sniper 32gb DDR5 6000
Video Card(s) GreenTeam 4070 ti super 16gb
Storage Samsung EVO 500gb & 1Tb, 2tb HDD, 500gb WD Black
Display(s) 1x Nixeus NX_EDG27, 2x Dell S2440L (16:9)
Case Phanteks Enthoo Primo w/8 140mm SP Fans
Audio Device(s) onboard (realtek?) - SPKRS:Logitech Z623 200w 2.1
Power Supply Corsair HX1000i
Mouse Steeseries Esports Wireless
Keyboard Corsair K100
Software windows 10 H
Benchmark Scores https://i.imgur.com/aoz3vWY.jpg?2
The move to extend the WSA indicates that the company may continue to use 12 nm-class I/O dies in its processors for the foreseeable future.

Seems like this is a bit of speculation, with the knowing exactly whats been agreed on. Is GF able to do 10nm with confidence after the botched job on Intel? This reads like AMD has doubts about that too.
 

Randomdude42

New Member
Joined
Dec 24, 2021
Messages
1 (0.00/day)
Complete speculation on my part, but maybe they will source SRAM for vcache with GF. SRAM does not scale well with node improvements. Just a pure guess though.
 
Joined
Mar 21, 2016
Messages
2,198 (0.74/day)
It would make sense for AMD to eventually transition these components to Samsung for 8nm eventually. Possibly TSMC at 7nm/6nm, but only if it actually makes since in terms of cost and making room to add additional chiplets perhaps by reducing the space and size these other components occupy.
 
Joined
Nov 4, 2005
Messages
11,691 (1.73/day)
System Name Compy 386
Processor 7800X3D
Motherboard Asus
Cooling Air for now.....
Memory 64 GB DDR5 6400Mhz
Video Card(s) 7900XTX 310 Merc
Storage Samsung 990 2TB, 2 SP 2TB SSDs and over 10TB spinning
Display(s) 56" Samsung 4K HDR
Audio Device(s) ATI HDMI
Mouse Logitech MX518
Keyboard Razer
Software A lot.
Benchmark Scores Its fast. Enough.
I would take a 12nm GPU and CPU that was meant for 7nm, it would probably clock as well and just use 15 percent more power
 
Joined
Jun 18, 2021
Messages
2,287 (2.19/day)
I would take a 12nm GPU and CPU that was meant for 7nm, it would probably clock as well and just use 15 percent more power

It could be a great solution to improve the supply situation if they backported some of the newer designs to more available nodes. Obviously you wouldn't get the same performance from a rx6900xt but for (what used to be) entry level stuff it wouldn't make much of a difference and could bring prices down...

... and their margins down as well so won't happen :(
 
Joined
Oct 26, 2008
Messages
2,244 (0.40/day)
System Name Budget AMD System
Processor Threadripper 1900X @ 4.1Ghz (100x41 @ 1.3250V)
Motherboard Gigabyte X399 Aorus Gaming 7
Cooling EKWB X399 Monoblock
Memory 4x8GB GSkill TridentZ RGB 14-14-14-32 CR1 @ 3266
Video Card(s) XFX Radeon RX Vega₆⁴ Liquid @ 1,800Mhz Core, 1025Mhz HBM2
Storage 1x ADATA SX8200 NVMe, 1x Segate 2.5" FireCuda 2TB SATA, 1x 500GB HGST SATA
Display(s) Vizio 22" 1080p 60hz TV (Samsung Panel)
Case Corsair 570X
Audio Device(s) Onboard
Power Supply Seasonic X Series 850W KM3
Software Windows 10 Pro x64
They should still be making 2nd Gen Threadrippers using GloFo too btw.. ;-)
 
Joined
Dec 21, 2021
Messages
62 (0.07/day)
looking back......GlobalFoundries should have spent the money on making 7nm. I guess no one expected the pandemic and the increase in demand for microchips
 
Joined
Dec 22, 2011
Messages
3,890 (0.86/day)
Processor AMD Ryzen 7 3700X
Motherboard MSI MAG B550 TOMAHAWK
Cooling AMD Wraith Prism
Memory Team Group Dark Pro 8Pack Edition 3600Mhz CL16
Video Card(s) NVIDIA GeForce RTX 3080 FE
Storage Kingston A2000 1TB + Seagate HDD workhorse
Display(s) Samsung 50" QN94A Neo QLED
Case Antec 1200
Power Supply Seasonic Focus GX-850
Mouse Razer Deathadder Chroma
Keyboard Logitech UltraX
Software Windows 11
Investing in the divested.

Delicious.
 
Joined
Feb 6, 2018
Messages
74 (0.03/day)
Processor i7 2600
Motherboard ASUS H67 rev. B3
Cooling EVO 212
Memory Kingston 8GB
Video Card(s) MSi 7870 GHz Edt.
Storage EVO 850 250GB + WD Black 1TB
Display(s) Dell U2412M
Case ASUS Essentio CG8250
Power Supply Delta 550W
Mouse Logitech
Keyboard Logitech
Software Windows 7
looking back......GlobalFoundries should have spent the money on making 7nm. I guess no one expected the pandemic and the increase in demand for microchips
I second that.
 
Joined
Jul 10, 2010
Messages
1,230 (0.24/day)
Location
USA, Arizona
System Name SolarwindMobile
Processor AMD FX-9800P RADEON R7, 12 COMPUTE CORES 4C+8G
Motherboard Acer Wasp_BR
Cooling It's Copper.
Memory 2 x 8GB SK Hynix/HMA41GS6AFR8N-TF
Video Card(s) ATI/AMD Radeon R7 Series (Bristol Ridge FP4) [ACER]
Storage TOSHIBA MQ01ABD100 1TB + KINGSTON RBU-SNS8152S3128GG2 128 GB
Display(s) ViewSonic XG2401 SERIES
Case Acer Aspire E5-553G
Audio Device(s) Realtek ALC255
Power Supply PANASONIC AS16A5K
Mouse SteelSeries Rival
Keyboard Ducky Channel Shine 3
Software Windows 10 Home 64-bit (Version 1607, Build 14393.969)
Is GF able to do 10nm with confidence after the botched job on Intel?
GlobalFoundries 7LP was fine, however GlobalFoundries didn't have investors nor any income to support volume ramp of 7LP. Initial capacity was 15,000 wspm for both 7LP and 7LP+EUV. To get more capacity the second phase of Malta needed to be built.
GlobalFoundries should have spent the money on making 7nm.
They did spend money on making 7nm. However, customers weren't willing to pay for capacity.

AMD #1 7LP customer opted to move to TSMC for first-source.
IBM #2 7LP customer opted to move to Samsung for first-source.
#3, #4, #5 did not need 7LP as soon or at all.
This reads like AMD has doubts about that too.
Fab8 is ramping up 45nm SOI; 45RF, 45RFe, 45CLO, 45SPCLO, 45SG01, 45SP3
Analysts who follow GloFo's node introductions also noted: 28SLP/28ULP and 22FDX/12FDX being integrated at Fab8, pre-ramp stage.

Going forward GlobalFoundries is less likely to maintain 14LPP/12LP/12LP+ supply with higher demand from 45nm, 28nm, 22nm, 12FDX platforms.
May 2021 => Removal of the exclusivity agreement of 14nm/12nm products.
December 2021 => Reduction of prices of 14nm/12nm wafers.
 
Last edited:

ARF

Joined
Jan 28, 2020
Messages
3,962 (2.55/day)
Location
Ex-usa
Why wasn't AMD willing to pay for GloFo's 7nm capacity? :kookoo::banghead: :confused:

AMD sabotages its own products by staying for too long on the old process nodes. It needs to decrease the power consumption and die sizes of those chipset thingies.
 
Joined
Mar 10, 2010
Messages
11,878 (2.30/day)
Location
Manchester uk
System Name RyzenGtEvo/ Asus strix scar II
Processor Amd R5 5900X/ Intel 8750H
Motherboard Crosshair hero8 impact/Asus
Cooling 360EK extreme rad+ 360$EK slim all push, cpu ek suprim Gpu full cover all EK
Memory Corsair Vengeance Rgb pro 3600cas14 16Gb in four sticks./16Gb/16GB
Video Card(s) Powercolour RX7900XT Reference/Rtx 2060
Storage Silicon power 2TB nvme/8Tb external/1Tb samsung Evo nvme 2Tb sata ssd/1Tb nvme
Display(s) Samsung UAE28"850R 4k freesync.dell shiter
Case Lianli 011 dynamic/strix scar2
Audio Device(s) Xfi creative 7.1 on board ,Yamaha dts av setup, corsair void pro headset
Power Supply corsair 1200Hxi/Asus stock
Mouse Roccat Kova/ Logitech G wireless
Keyboard Roccat Aimo 120
VR HMD Oculus rift
Software Win 10 Pro
Benchmark Scores 8726 vega 3dmark timespy/ laptop Timespy 6506
Why wasn't AMD willing to pay for GloFo's 7nm capacity? :kookoo::banghead: :confused:

AMD sabotages its own products by staying for too long on the old process nodes. It needs to decrease the power consumption and die sizes of those chipset thingies.
You do realise GF gave up on 7Nm, they're now specialists in Soic and other RF technology.
That's why they're used for the Io dies not core's.
Glofos 7Nm doesn't exist, anymore.
 

ARF

Joined
Jan 28, 2020
Messages
3,962 (2.55/day)
Location
Ex-usa
I know what happened. The question is why AMD continues to work with GloFo, and instead doesn't jump onto the new TSMC N3 and N5 process nodes.
 
Joined
Mar 10, 2010
Messages
11,878 (2.30/day)
Location
Manchester uk
System Name RyzenGtEvo/ Asus strix scar II
Processor Amd R5 5900X/ Intel 8750H
Motherboard Crosshair hero8 impact/Asus
Cooling 360EK extreme rad+ 360$EK slim all push, cpu ek suprim Gpu full cover all EK
Memory Corsair Vengeance Rgb pro 3600cas14 16Gb in four sticks./16Gb/16GB
Video Card(s) Powercolour RX7900XT Reference/Rtx 2060
Storage Silicon power 2TB nvme/8Tb external/1Tb samsung Evo nvme 2Tb sata ssd/1Tb nvme
Display(s) Samsung UAE28"850R 4k freesync.dell shiter
Case Lianli 011 dynamic/strix scar2
Audio Device(s) Xfi creative 7.1 on board ,Yamaha dts av setup, corsair void pro headset
Power Supply corsair 1200Hxi/Asus stock
Mouse Roccat Kova/ Logitech G wireless
Keyboard Roccat Aimo 120
VR HMD Oculus rift
Software Win 10 Pro
Benchmark Scores 8726 vega 3dmark timespy/ laptop Timespy 6506
I know what happened. The question is why AMD continues to work with GloFo, and instead doesn't jump onto the new TSMC N3 and N5 process nodes.
Well contract's are going to be one point, they're obligated to and have been for years.
Constrained production capacity elsewhere likely isn't helping too.
And swapping to these lower nodes is not easy, it's usually a progressive process.

And when it comes to IO dies AMD can't afford to have it fd up, they need consistently made large batches usually best suited to very well established processes, without Io dies they're server lines fold, so do consumer lines, a badly yielding node doesn't typically mean the company manufacturing the wafer gets less money either so 3Nm low yields are shouldered by the buyer not the foundries.
 
Joined
Jul 10, 2010
Messages
1,230 (0.24/day)
Location
USA, Arizona
System Name SolarwindMobile
Processor AMD FX-9800P RADEON R7, 12 COMPUTE CORES 4C+8G
Motherboard Acer Wasp_BR
Cooling It's Copper.
Memory 2 x 8GB SK Hynix/HMA41GS6AFR8N-TF
Video Card(s) ATI/AMD Radeon R7 Series (Bristol Ridge FP4) [ACER]
Storage TOSHIBA MQ01ABD100 1TB + KINGSTON RBU-SNS8152S3128GG2 128 GB
Display(s) ViewSonic XG2401 SERIES
Case Acer Aspire E5-553G
Audio Device(s) Realtek ALC255
Power Supply PANASONIC AS16A5K
Mouse SteelSeries Rival
Keyboard Ducky Channel Shine 3
Software Windows 10 Home 64-bit (Version 1607, Build 14393.969)
Why wasn't AMD willing to pay for GloFo's 7nm capacity?
GlobalFoundries for 2018+ only had 15,000 wafers that had an asking price of $4 billion.
2020+ needed a second fab(and third for 5LP/3LP) which was >$15 billion(>$20 billion).

Net income for AMD(millions):
2020$2,490
2019$341
2018$337
2017$-33
2016$-498
2015$-660
2014$-403
2013$-83

Where would AMD pay for 7nm capacity? Being largely the sole customer of GloFo 7nm. Where as TSMC had customers, high net income, low-risk CapEx for expansion, etc. AMD didn't need to pay for capacity or a foundry for 7nm onwards with TSMC. The whole point of separating from GloFo to begin with was to NOT pay for foundry or capacity.
The question is why AMD continues to work with GloFo, and instead doesn't jump onto the new TSMC N3 and N5 process nodes.
GlobalFoundries-AMD has a WSA which obligates AMD to use GlobalFoundries. These more recent WSA's 2019/May 2021/December 2021 are all about minimizing costs w/ GloFo.

AMD being 28% of GlobalFoundries revenue in 2019 and 21% in 2020.
~$1.51816B for 2019; $5.422B with negative net income
~$1.18881B for 2020; $5.661B with negative net income
With 2021 being expected to be less than ~20%; Q3 2021 first positive net income for GlobalFoundries(primarily from older nodes than 14nm/12nm FinFETs)

Malta/Fab8 from the beginning was operated as a loss. Hence, why GlobalFoundries never made positive net income up till this point.
-0.604B in 2012
-0.876B in 2013
-1.5B in 2014
-1.3B in 2015
-0.426B in 2016

GloFo for AMD, basically crippled themselves, never actually being able to self-fund like TSMC, Samsung, Intel, UMC, SMIC. Mubadala stopped major funding GloFo sometime before the pivot.
 
Last edited:
Joined
Jul 7, 2019
Messages
831 (0.47/day)
I wonder if AMD intends to use GloFo for sectors that don't need bleeding or leading edge tech, like automotive, semi-custom solutions (moreso once they get Xilinx IP fully integrated), and certain cheap OEM components (like continued production of older Zen CPUs and GPUs for OEM-only markets). Those only need a relatively modern and mature process node for most of those tasks, and with tech becoming ever more integrated into vehicles (extreme cases like Tesla using an Nvidia or Radeon GPU aside), it'd be another ideal market for AMD's dedicated semi-custom division and with full knowledge of leveraging GloFo's 12/14nm process.

That aside, the other possibility is AMD looking into lucrative government (military) contracts. After all, Fab 8 only recently (in February 2021) got early certifications on the road to becoming a Trusted Foundry for the US government, and assuming all goes well, that certification may come late 2022 or 2023. That would also give AMD, the primary user of GloFo's 12/14nm process at Fab 8, plenty of leverage to use the reserved production lines for military hardware that don't need hardening at the chip level but need something relatively fast and modern. For GloFo, it's also a possible lead-in to getting additional funding via the CHIPS Act, and maybe a way to get some government sponsored funding for newer-gen node upgrades (whether it's restarting their 7nm equivalent or licensing Samsung's nodes again like they did with 14nm).
 
Joined
Jul 10, 2010
Messages
1,230 (0.24/day)
Location
USA, Arizona
System Name SolarwindMobile
Processor AMD FX-9800P RADEON R7, 12 COMPUTE CORES 4C+8G
Motherboard Acer Wasp_BR
Cooling It's Copper.
Memory 2 x 8GB SK Hynix/HMA41GS6AFR8N-TF
Video Card(s) ATI/AMD Radeon R7 Series (Bristol Ridge FP4) [ACER]
Storage TOSHIBA MQ01ABD100 1TB + KINGSTON RBU-SNS8152S3128GG2 128 GB
Display(s) ViewSonic XG2401 SERIES
Case Acer Aspire E5-553G
Audio Device(s) Realtek ALC255
Power Supply PANASONIC AS16A5K
Mouse SteelSeries Rival
Keyboard Ducky Channel Shine 3
Software Windows 10 Home 64-bit (Version 1607, Build 14393.969)
That aside, the other possibility is AMD looking into lucrative government (military) contracts. After all, Fab 8 only recently (in February 2021) got early certifications on the road to becoming a Trusted Foundry for the US government, and assuming all goes well, that certification may come late 2022 or 2023.
In context, the Fab8 government deal is actually based off the 45nm SOI node:
Under the agreement, GF will provide a supply of chips built at Fab 8 on its differentiated 45nm SOI platform. The agreement is made possible by Fab 8’s compliance with U.S. International Traffic in Arms Regulations (ITAR) and highly restrictive Export Control Classification Numbers under the Export Administration Regulations (EAR).
Which extends to:
The RAD510 SoCs are manufactured at GF’s Fab 10 facility in East Fishkill, N.Y., also a U.S. Department of Defense Category 1A Microelectronics Trusted Source. GF and BAE Systems have initiated the process of transitioning the manufacturing of 45 nm SOI technology to GF’s most advanced facility, Fab 8 in Malta, N.Y., making it available to the space community in the future.
Supply chain for Fab10 -> Fab8 of SOI nodes:

It is more likely any deal for GlobalFoundries is actually providing a roadmap for the SOI nodes;
GF’s proven track record as a longtime supplier of secure semiconductor solutions for the defense industry dovetails with SkyWater’s focus on developing capabilities for enabling critical microelectronics technologies for national security applications. Notably, SkyWater is bringing to market a 90nm Strategic Rad-Hard process technology via an up to $170M DoD investment which, when combined with diverse GF platforms, will provide a richer portfolio of key defense technology offerings. The collaboration is also exploring possibilities for dual fab processing that would streamline access to secure technologies for defense programs. Additionally, as a part of the MOU, GF and SkyWater will align technology roadmaps and leverage unique and complementary capabilities for development and high-volume production path to market for advanced computing, artificial intelligence and related technologies.
RH90 is a fully depleted silicon-on-insulator complementary metal-oxide-semiconductor process specifically developed to produce electronics which can withstand harsh radiation environments. SkyWater aims to accelerate delivery of its offering to address U.S. government needs.
Converting Malta/Fab8 from 14LPP/12LP/12LP+ to 90nm RH-FDSOI -> 45nm RH-FDSOI -> 22nm RH-FDSOI -> 12nm RH-FDSOI is inline with GlobalFoundries prior obligations.

-----
That would also give AMD, the primary user of GloFo's 12/14nm process at Fab 8, plenty of leverage to use the reserved production lines for military hardware that don't need hardening at the chip level but need something relatively fast and modern. For GloFo, it's also a possible lead-in to getting additional funding via the CHIPS Act, and maybe a way to get some government sponsored funding for newer-gen node upgrades (whether it's restarting their 7nm equivalent or licensing Samsung's nodes again like they did with 14nm).
The CHIPS Funding will most likely be used 12nm/sub-10nm FDSOI;
Technology solutions exist for 12nm and even sub-10nm nodes: no show-stopper identified at the device level
CEA Leti has modeled a 10nm FDSOI process and run test devices that match the modeled results. CEA Leti has also modeled 7nm and because 10nm did not need all of the performance boosters that are available Marie Semeria said she is confident 7nm is possible.
Page 10 minimum spec is 7nm node generation. GlobalFoundries has Monolithic 3D/CoolCube 3D for continuous scaling for example: 2-layer for 4nm/3nm FDSOI and 4-layer for 2nm/1.8nm FDSOI platforms.

Going forward the strategy for AMD is to minimize damage if GlobalFoundries drops 14nm/12nm FinFETs for aggressive FDSOI positioning.


====
Dresden = Already FDSOI
Malta = Transitioning to FDSOI
Singapore = Fab7H/"New Fab Singapore" is a replacement for Fab11P1(130/180nm)/P2(22FDX)(Chengdu)
$10B(undisclosed) with half-being paid by GloFo(>$4B) and half-being paid by Customers/Government(>$4B from Singapore Economic Development Board and with co-investments from committed customers)
Which is similar price arrangement as Chengdu; ~$5B from GloFo and ~$5B from MediaTek(/AMD China/Rockchip)/Chengdu Municipal Gov.

For example of internal dual-source reserving:
GF shall have the exclusive right to decide at which of Fab 1 or Fab 7 (or both) a new Product will be taped-out, qualified, and manufactured. => If production will be in both Fabs, Customer and GF will make commercially reasonable efforts to qualify the Product at both Fabs.

An oldie:
charteredamdnowglofo.png

AMD Foundry Dresden and Chartered Singapore => Now, GlobalFoundries Fab1/Fab7.

On another note, AMD disclosed they lost manufacturing capability of 32SHP/28SHP/28A at GlobalFoundries sometime in 2020 for 32SHP and 2021 for 28SHP/28A.
322828.png

I believe this also covers the ~360 mm2 A9-9820 Cato chips.
apu-die.jpg

2x4-core + RX 350(iGPU) + Quad-channel DDR3

In relation to volume of wafers bought, 2021 onwards it is only 14nm/12nm products as far as official already out products go.

Any Malta pivots away from 14nm/12nm FinFETs by GloFo will be disclosed next year.
Samsung-GlobalFoundries => April 2014 // Killed 20LPM/20SHP/20AN/14XM
GlobalFoundries Ends 7nm => August 2018 // Killed 7LP/5LP/3LP
Potential date for FinFETs being killed off => April 2022-August 2022 // Killing production of 14LPP/12LP/12LP+ to fit in 22FDX(Co-fabbed w/ Singapore+Dresden)/12FDX(Co-Fabbed w/ Dresden).

Getting away from AMD and looking at the American picture:
Intel has 22FFL and 14GP at Oregon, currently there is no 22nm at Malta and 14LPP/12LP/12LP+ does not compete against Intel's FinFETs.
The MOSIS Service, is collaborating with Intel Corporation to provide access to 22nm FinFET Low-power (22FFL) process technology for the microelectronics design community through the Intel Custom Foundry. To encourage participation in the MOSIS Service offerings of Intel’s multi-project wafer (MPW) fabrication runs, the Office of the Under Secretary of Defense for Research and Engineering (OUSD(R&E)) Trusted and Assured Microelectronics (T&AM) Program aims to potentially sponsor MPW runs in government fiscal year (GFY)-2020 and GFY-2021.
W/ PG's Gov involvement leading towards Gov:14LPP/12LP/12LP+ designs being shifted towards Gov:14GP instead. Which means going forward GloFo is less likely to win out trying to use FinFETs on CHIPS. When Intel is better at service and end quality, a.k.a. money well spent.

Samsung has 17LPV/18FDS and 14LPE/14LPP/14LPC/14LPU/11LPP at Austin, there is no response to 17LPV(20nm FinFET<90CPP> w/ 28nm BEOL)/18FDS(20nm FDSOI<90CPP> w/ 14nm BEOL) and Samsung has a second source in Korea for FinFETs/FDSOI.
samsung-17nm-node-process-1.jpeg


New Capacity/Fab growth:
Intel Oregon/Arizona FinFETs
TSMC Arizona FinFETs
Samsung Texas (Majority FinFETs for Perf/Minority FDSOI for Power)

GlobalFoundries is the only foundry that has FDSOI for Performance and they don't even fab it in America.
 
Last edited:
Top