- Joined
- Jan 5, 2006
- Messages
- 17,841 (2.67/day)
System Name | AlderLake / Laptop |
---|---|
Processor | Intel i7 12700K P-Cores @ 5Ghz / Intel i3 7100U |
Motherboard | Gigabyte Z690 Aorus Master / HP 83A3 (U3E1) |
Cooling | Noctua NH-U12A 2 fans + Thermal Grizzly Kryonaut Extreme + 5 case fans / Fan |
Memory | 32GB DDR5 Corsair Dominator Platinum RGB 6000MHz CL36 / 8GB DDR4 HyperX CL13 |
Video Card(s) | MSI RTX 2070 Super Gaming X Trio / Intel HD620 |
Storage | Samsung 980 Pro 1TB + 970 Evo 500GB + 850 Pro 512GB + 860 Evo 1TB x2 / Samsung 256GB M.2 SSD |
Display(s) | 23.8" Dell S2417DG 165Hz G-Sync 1440p / 14" 1080p IPS Glossy |
Case | Be quiet! Silent Base 600 - Window / HP Pavilion |
Audio Device(s) | Panasonic SA-PMX94 / Realtek onboard + B&O speaker system / Harman Kardon Go + Play / Logitech G533 |
Power Supply | Seasonic Focus Plus Gold 750W / Powerbrick |
Mouse | Logitech MX Anywhere 2 Laser wireless / Logitech M330 wireless |
Keyboard | RAPOO E9270P Black 5GHz wireless / HP backlit |
Software | Windows 11 / Windows 10 |
Benchmark Scores | Cinebench R23 (Single Core) 1936 @ stock Cinebench R23 (Multi Core) 23006 @ stock |
Intel has started building two new chip factories in the US state of Arizona.
These factories, which will be called Fab 52 and Fab 62, will cost a combined $20 billion and should be fully operational by 2024.
These factories, which will be called Fab 52 and Fab 62, will cost a combined $20 billion and should be fully operational by 2024.
Intel breaks ground on $20 bln Arizona plants as U.S. chip factory race heats up
Intel Corp on Friday broke ground on two new factories in Arizona as part of its turnaround plan to become a major manufacturer of chips for outside customers.
www.reuters.com