Just over one year after revealing plans for a major global capacity expansion, GLOBALFOUNDRIES today announced its newly constructed cleanrooms in New York and Dresden are ready for the installation of 300mm semiconductor wafer fabrication equipment. Achieving “Ready for Equipment” (RFE) status marks the transition from the construction phase to the operations phase—a significant milestone on the path to volume manufacturing in these new facilities.

“At GLOBALFOUNDRIES, we continue to invest aggressively in driving sustained growth on advanced technologies,” said GLOBALFOUNDRIES CEO Ajit Manocha. “The build-out of our 300mm manufacturing campuses in New York and Dresden is supporting growing customer demand for advanced technologies, while creating hundreds of jobs and providing a significant boost to the economies in the surrounding regions. By completing these massive construction projects on schedule and on budget, we are continuing to deliver on our commitment to being the only truly global foundry.”

At Fab 1 in Dresden, Germany, GLOBALFOUNDRIES has completed construction of an additional wafer manufacturing facility designed to add capacity at 45nm and below, which has the potential to increase the overall output of the Fab 1 campus to 80,000 wafers per month once fully ramped. The expansion project will add more than 110,000 square feet of cleanroom space to the site and will allow Fab 1 to operate as one integrated cleanroom. This extension will make Dresden the largest wafer fab in Europe for leading-edge technology.

At Fab 8, GLOBALFOUNDRIES’ newest semiconductor manufacturing facility under construction at the Luther Forest Technology Campus in Saratoga County, New York, the RFE date was moved up by nearly two months to meet heavy customer demands. Last week, GLOBALFOUNDRIES moved into the facility’s Admin 1 office building and broke ground on the Admin 2 building. Once completed, Fab 8 will stand as the most technologically advanced wafer fab in the world and the largest leading-edge semiconductor foundry in the United States.

When fully built-out and ramped, the total available cleanroom space will be approximately 300,000 square feet and will be capable of a total output of approximately 60,000 wafers per month. The total facility, including cleanroom support infrastructure and office space, includes approximately 1.9 million square feet of space and is expected to come online in 2012 with volume production targeted for early 2013. Fab 8 will focus on leading-edge manufacturing at 28nm and below.
 
Last edited:
Joined
Jun 16, 2009
Messages
5,123 (1.63/day)
Likes
989
Location
North of Germany
System Name Heatbitch / The Dark Tower / Custom Acer
Processor AMD Phenom 2 X4 960T @ 4200mhz 1,44v,3130NB /Q9550 3.4ghz 1.20v/ X2 260 1.42v @3.6
Motherboard Asus M4A89GTD PRO / Asus Rampage Formula/Foxconn A7DA-S 3.0
Cooling Heatkiller 3.0 LT,Laing DDC+,Octakaideca-Rad /EK SP,Tt 400L, B.Ice XT2/Xiggy Black Knight
Memory 4x2gb Transcend 2400 CL10 1.65v: 1600 7-8-7-24-40 1.65 /Dominator 1066 2GB/Ripjaws 2000 CL9 4GB
Video Card(s) 6970, soon to be WCed/ 4870x2 HK Full Cover WC´d / 2xGeforce 8800GT HyperSLI
Storage 128gb Vertex 3, 32GB Ultradrive GX2, 320GB+500GB+2x1TB F1 /160gb Maxtor,500gb F1/ 160GB WD
Display(s) LG Flatron 23" W2353V /Benq 19" FP93E-S/TFT 17"
Case Thermaltake Shark /Superflower SF-860B/Acer m-ATX Tower
Audio Device(s) Realtek Onboard Sound, on all of them
Power Supply Corsair TX850/ OCZ Modxstream-Pro 600W/ MS-Tech 750w
Software XP 32bit Professional+ Win7 64Bit Ultimate
Benchmark Scores 3DMark Vantage: P21385 3DM11: P5920
#2
Just over one year after revealing plans for a major global capacity expansion, GLOBALFOUNDRIES today announced its newly constructed cleanrooms in New York and Dresden are ready for the installation of 300mm semiconductor wafer fabrication equipment. Achieving “Ready for Equipment” (RFE) status marks the transition from the construction phase to the operations phase—a significant milestone on the path to volume manufacturing in these new facilities.

“At GLOBALFOUNDRIES, we continue to invest aggressively in driving sustained growth on advanced technologies,” said GLOBALFOUNDRIES CEO Ajit Manocha. “The build-out of our 300mm manufacturing campuses in New York and Dresden is supporting growing customer demand for advanced technologies, while creating hundreds of jobs and providing a significant boost to the economies in the surrounding regions. By completing these massive construction projects on schedule and on budget, we are continuing to deliver on our commitment to being the only truly global foundry.”

At Fab 1 in Dresden, Germany, GLOBALFOUNDRIES has completed construction of an additional wafer manufacturing facility designed to add capacity at 45nm and below, which has the potential to increase the overall output of the Fab 1 campus to 80,000 wafers per month once fully ramped. The expansion project will add more than 110,000 square feet of cleanroom space to the site and will allow Fab 1 to operate as one integrated cleanroom. This extension will make Dresden the largest wafer fab in Europe for leading-edge technology.

At Fab 8, GLOBALFOUNDRIES’ newest semiconductor manufacturing facility under construction at the Luther Forest Technology Campus in Saratoga County, New York, the RFE date was moved up by nearly two months to meet heavy customer demands. Last week, GLOBALFOUNDRIES moved into the facility’s Admin 1 office building and broke ground on the Admin 2 building. Once completed, Fab 8 will stand as the most technologically advanced wafer fab in the world and the largest leading-edge semiconductor foundry in the United States.

When fully built-out and ramped, the total available cleanroom space will be approximately 300,000 square feet and will be capable of a total output of approximately 60,000 wafers per month. The total facility, including cleanroom support infrastructure and office space, includes approximately 1.9 million square feet of space and is expected to come online in 2012 with volume production targeted for early 2013. Fab 8 will focus on leading-edge manufacturing at 28nm and below.
Now, what a coincidence! About a day ago, i stated the wish, that GloFo would construct new Fabs.... seems they have listened, before i even thought about it!:laugh:
 
Joined
Jul 31, 2010
Messages
47 (0.02/day)
Likes
4
Location
Romania
#3
good news for AMD, which is still one one of parent companies of GF. things are looking pretty bright for AMD now
 
Joined
Dec 6, 2005
Messages
9,941 (2.25/day)
Likes
3,895
Location
Manchester, NH
System Name Working on it ;)
Processor I7-4790K
Motherboard MSI Z97 U3 Plus
Cooling Be Quiet Pure Rock Air
Memory 16GB 4x4 G.Skill CAS9 2133 Sniper
Video Card(s) Power Color RD Vega 64 Reference
Storage Samsung EVO 500GB / 8 Different WDs / NAS with 2x2Tb WD Black
Display(s) 34" LG 34CB88-P 21:9 Curved UltraWide QHD (3440*1440)
Case Rosewill Challenger
Audio Device(s) Onboard + HD HDMI
Power Supply Corsair HX750 (love it)
Mouse Logitech G5
Keyboard Logitech G710 Blue / G610 Orion Red
Software Win 7 Pro
#4
Mmmmm 28nm goodness (and below!)
 
Joined
Oct 13, 2007
Messages
7,693 (2.05/day)
Likes
1,772
Location
Chicago
System Name DarkStar
Processor i5 3570K 4.4Ghz
Motherboard Asrock Z77 Extreme 3
Cooling Apogee HD White/XSPC Razer blocks
Memory 8GB Samsung Green 1600
Video Card(s) 2 x GTX 670 4GB
Storage 2 x 120GB Samsung 830
Display(s) 27" QNIX
Case Enthoo Pro
Power Supply Seasonic Platinum 760
Mouse Steelseries Sensei
Keyboard Ducky Pro MX Black
Software Windows 8.1 x64
#6
good news for AMD, which is still one one of parent companies of GF. things are looking pretty bright for AMD now
Mmm competition...
 

NAVI_Z

New Member
Joined
Aug 7, 2010
Messages
253 (0.09/day)
Likes
36
System Name Gamer Rig
Processor AMD Phenom II X4 965 BE
Motherboard ASUS M4A78T-E
Cooling Corsair H-50 cpu cooler.Kingston Hyper X ram cooler
Memory Corsair Dominator DDR3 1600
Video Card(s) XFX HD 5870 XXX Edition
Storage WD Velociraptor 300gig ; SAmsung Spinpoint 250gig
Display(s) Samsung SyncMaster 2494 24 inch full 1080p
Case NZXT TEMPEST AIRFLOW KING
Audio Device(s) none
Power Supply Kingwin 800w modular
Software Win 7 Ultimate 64 bit
#7
yesssssss........go AMD go!!!......:rockout::D:pimp: