Friday, July 11th 2014
NVIDIA Moving Around the Fabled GeForce GTX TITAN II
NVIDIA is moving around engineering samples of what it describes as "GM200 A1 graphics processor," in its shipping manifest. The sample was making its way from Taiwan, to Bangalore, India, from where it's likely pushed to the company's facilities in Bangalore and Hyderabad. A1 steppings of NVIDIA chips are usually pre-production, and bound for just a few more rounds of testing, before being upgraded to "A2" and mass-produced. German tech site 3DCenter.org also pulled out some likely specifications from its sources.
To begin with, the GM200, like the GM204, will be built on existing 28 nm silicon fabrication process, as both NVIDIA and AMD appear to have suffered design setbacks due to their common foundry partner, TSMC, not being able to set its next-gen 20 nm node up to speed in time. The GM200 is expected to feature over 4,000 CUDA cores, although the exact number is unknown. It is expected to widen the memory bus to 512-bit. Given the existing process, the GPU will be huge. Over 600 mm² huge. NVIDIA will probably bank on the energy efficiency of its "Maxwell" architecture to cope with thermal loads put out by a chip that big. The GM200-based "GeForce GTX TITAN II" could launch in the first half of 2015.
Source:
3DCenter.org
To begin with, the GM200, like the GM204, will be built on existing 28 nm silicon fabrication process, as both NVIDIA and AMD appear to have suffered design setbacks due to their common foundry partner, TSMC, not being able to set its next-gen 20 nm node up to speed in time. The GM200 is expected to feature over 4,000 CUDA cores, although the exact number is unknown. It is expected to widen the memory bus to 512-bit. Given the existing process, the GPU will be huge. Over 600 mm² huge. NVIDIA will probably bank on the energy efficiency of its "Maxwell" architecture to cope with thermal loads put out by a chip that big. The GM200-based "GeForce GTX TITAN II" could launch in the first half of 2015.

61 Comments on NVIDIA Moving Around the Fabled GeForce GTX TITAN II
Ridiculous, isn't it?
Sadly, this is exactly what happens, we already "have" that piece of shit for $3000!!!
if you are so stupid to not be able to produce high-end chips on normally priced manufacturing processes,
THEN, FOR GOD'D SAKE, DON'T DO IT, DON'T WASTE YOUR AND MORE IMPORTANTLY OUR TIME WITH YOUR SHITS!
They design the chip, then have them fabd. Not all chips come out rosie... So what they do to cut losses is disable the poorly performing cores and whatever is left becomes whatever performance category it falls under. The flagship (780ti, 580, 7970ghz) that comes at the end is just process maturazation.
As for shipping "broken" parts, AMD was the company that neutered and shipped Phenom with the TLB issues well documented, so they hardly get a pass. They also currently have a flagship product that runs "as planned" at 90c+. The only reason AMD is so cost effective is because Intel and Nvidia have been regularly keeping them in check btw.
AMD, historically, has always been offering better products at their respective price points.
With their arrogant greed, nvidia did even lose Sony Playstation 4 and the Microsoft's console orders.
The Titan brand name is is like Intels Extreme line imo. Though I do think Nvidia should not market the Titan line as gaming cards like they have been. Really they are a do everything card. Offer some of the best gaming performance, while also being a cheaper option for developers and professionals who need the compute performance.