Thursday, May 14th 2020

TSMC Building a 5nm Fab in Arizona as the U.S. Government Gets Involved

It has become a matter of national strategy (or pride) to get TSMC to build a cutting-edge silicon fabrication facility on U.S. soil. Hot on the heals of a report in which TSMC denied it has any plans to build a fab in the U.S., we're learning from a Wall Street Journal that the world's largest independent semiconductor manufacturing company, will build a facility in the U.S. after all. Apparently TSMC will build a silicon fabrication facility in the state of Arizona. The fab will manufacture 5 nm-class chips, to begin with.

TSMC got around to drawing up plans to build a stateside facility after the "involvement" of the State- and Commerce Departments of the U.S. Government. The two are involved not just in coaxing TSMC, but also in the specifics of the planning to get them to the Grand Canyon state. The Donald Trump administration made significant national policy changes with manufacturing, in the wake of the COVID-19 pandemic causing significant wait times in getting silicon products from Asia to the US.

Update 01:25 UTC: TSMC made its U.S. fab plans official with an announcement. Press release and additional commentary below.

TSMC Press Release

TSMC today announced its intention to build and operate an advanced semiconductor fab in the United States with the mutual understanding and commitment to support from the U.S. federal government and the State of Arizona.

This facility, which will be built in Arizona, will utilize TSMC's 5-nanometer technology for semiconductor wafer fabrication, have a 20,000 semiconductor wafer per month capacity, create over 1,600 high-tech professional jobs directly, and thousands of indirect jobs in the semiconductor ecosystem. Construction is planned to start in 2021 with production targeted to begin in 2024. TSMC's total spending on this project, including capital expenditure, will be approximately US$12 billion from 2021 to 2029. This U.S. facility not only enables us to better support our customers and partners, it also gives us more opportunities to attract global talents. This project is of critical, strategic importance to a vibrant and competitive U.S. semiconductor ecosystem that enables leading U.S. companies to fabricate their cutting-edge semiconductor products within the United States and benefit from the proximity of a world-class semiconductor foundry and ecosystem.

TSMC welcomes continued strong partnership with the U.S. administration and the State of Arizona on this project. This project will require significant capital and technology investments from TSMC. The strong investment climate in the United States, and its talented workforce make this and future investments in the U.S. attractive to TSMC. U.S. adoption of forward-looking investment policies to enable a globally competitive environment for a leading edge semiconductor technology operation in the U.S. will be crucial to the success of this project. It will also give us the confidence this and other future investments by TSMC and its supply chain companies will be successful.

In the United States, TSMC currently operates a fab in Camas, Washington and design centers in both Austin, Texas and San Jose, California. The Arizona facility would be TSMC's second manufacturing site in the United States.

TechPowerUp Commentary

The key words in the above press release are "build and operate," and excludes ownership. It looks like the U.S. government has talked TSMC into limiting its financial exposure, by simply franchising itself to a U.S.-based entity that will foot the bill of this venture.

We also recently covered a China Times report pointing at Intel being one of TSMC's 5 nm-class customers, possibly for its future-generation Xe HP scalar processors, which constitute high-technology. HPC chips are low-volume, high-margin products, and so the U.S. could find it in its strategic interest to see them manufactured on home soil.
Source: Wall Street Journal
Add your own comment

58 Comments on TSMC Building a 5nm Fab in Arizona as the U.S. Government Gets Involved

#51
ARF
Caring1A fissure is created by unstable geology, the Grand Canyon is caused by erosion.
It's a result of the Laramide orogeny - mountain building in what was seabed or shallow waters en.wikipedia.org/wiki/Laramide_orogeny
Posted on Reply
#52
Dante Uchiha
Caring1A fissure is created by unstable geology, the Grand Canyon is caused by erosion.
Arizona's in the danger zone anyway.

Posted on Reply
#54
Flanker
A couple of years ago I was looking for new jobs, a headhunter from Taiwan told me that the local infrastructure is having trouble keeping up with the expanding needs of TSMC for water and electricity, and building new fabs overseas will just be a matter of time. I guess US is a sensible choice right now.
Posted on Reply
#55
$ReaPeR$
Well this is an interesting thread! This is just a stunt to sell the "bring back our jobs" crowd. Useless political manipulation for people that feel more than they think. As for the "security" issues, are you fing kidding me? Did everyone forget about Snowden? The US is "afraid" of someone else doing exactly the same thing that they have been doing for the last 20 years, I would call it hypocrisy but it doesn't really matter. No one gives a crap about reality, it's far better to eat the fairytale that your Messiah of choice is selling. Humanity is a bad joke.
Posted on Reply
#56
svan71
Thank you president Trump.
Posted on Reply
#57
TechLurker
I have to wonder if it was also somewhat political with the choice being Arizona of all places, instead of say Oregon, like the Ex-Hynix Eugen factory (which was recently bought by a digital sign-making company but could have been the perfect facility to use as base), or Washington state, or even Wisconsin again (as part of the the tech-industrial park near where the superficial Foxconn facility is).
Posted on Reply
#58
ARF
FlankerA couple of years ago I was looking for new jobs, a headhunter from Taiwan told me that the local infrastructure is having trouble keeping up with the expanding needs of TSMC for water and electricity, and building new fabs overseas will just be a matter of time. I guess US is a sensible choice right now.
Water in Arizona ?
Well, at least there is too much silica sand down there.
Posted on Reply
Add your own comment
Nov 26th, 2026 16:52 CST change timezone

New Forum Posts

Popular Reviews

TPU on YouTube

Controversial News Posts