CyberDruid
New Member
- Joined
- Sep 23, 2007
- Messages
- 2,887 (0.47/day)
- Location
- On top of a mountain
System Name | Shop Dog |
---|---|
Processor | E8400 |
Motherboard | Asus Blitz Formula SE |
Cooling | d-Tek FuZion |
Memory | 2 x 2GB DDR2 800 G Skill |
Video Card(s) | EVGA 7900 GTX |
Storage | 150GB VelociRaptor |
Display(s) | Acer 21.5 1080p LED Back Lit Monitor |
Case | Working on it |
Audio Device(s) | PCI SoundMax |
Power Supply | Silverstone 750 Modular |
Software | XP Pro SP2 |
Benchmark Scores | Super Pi 11.56s 1M at 4050mhz |
Yeah man I am redoing it in a number of ways. I want the cylinders to be independently removable/fillable. I am using larger diameter tubes and end caps: this will space the barbs 1/4" further apart...instead of having to deal with a large semifragile assembly when draining the loop I want FlyingA2 to be able to just lift a cylinder res off the rack and deal with it...
This way when I encounter porblems during assembly I am not wrestling with three reservoirs at once. Unfortunate reality is that there are many ways to get it wrong and only one way to get it right lol.
This way when I encounter porblems during assembly I am not wrestling with three reservoirs at once. Unfortunate reality is that there are many ways to get it wrong and only one way to get it right lol.