News Posts matching #DRAM

Return to Keyword Browsing

Microsoft Surface Laptops Get $200-300 Price Hike Due To RAMpocalypse

We've already seen large swathes of the PC hardware market get drastically affected by the ongoing DRAM and general hardware crisis, from Valve's upcoming Steam Machine to pre-built desktop PCs. Now, it seems as though it's Microsoft's turn with its Surface device line-up, which has seen a price increase of anywhere between $200 and $500, depending on the exact model. The price increases mean that the 13-inch Surface Pro with the Qualcomm Snapdragon X SoC, 16 GB of RAM, and 512 GB of storage increases by $300 to $1,499; while the 12-inch Surface Pro with the Snapdragon X, 16 GB RAM, and 256 GB of storage increases from $799 to $1,049; the 13-inch Surface Laptop with the Snapdragon X Plus, 16 GB RAM, and a 256 GB SSD increases from $899 to $1,199; the 13.8-inch Surface Laptop with the same SoC and RAM but 512 GB of storage increases from $1,199 to $1,499; and the Surface Laptop 15-inch with the Snapdragon X Elite SoC, 16 GB of RAM, and 256 GB of SSD storage sees a price hike from $1,499 to $1,599.

Microsoft confirmed in a statement to Windows Central that the price increases were a direct result of the current hardware constraints, with a Microsoft representative stating "Due to recent increases in memory and component costs, Surface is updating pricing on Microsoft.com for its current-generation hardware portfolio. We remain committed to delivering value to customers and partners while upholding our standards for quality and innovation." This news comes just after we reported that DDR4 spot prices have seen a marginal decrease. Microsoft's Surface line-up has never been the best value when it comes to Windows laptops, and they'll likely be an even tougher sell after the price hikes, especially with Apple's recent introduction of the hyper-popular $600 MacBook Neo and with the somewhat limited app and feature support that comes with Qualcomm's Snapdragon SoCs and Windows on Arm.

Nanya Reports Q1 2026 Revenue Up 63%, Bit Shipments Decline Slightly

Nanya Technology Corporation ("NTC", TWSE: 2408), today announced its results of operations for the first quarter, ended March 31, 2026. Nanya's quarterly sales revenue was NT$49,087 million, a 63.1 percent increase compared to that in the fourth quarter of 2025. In the first quarter of 2026, average selling prices (ASP) increased by more than seventy percent and bit shipment decreased by mid-single digit percent quarter over quarter.

Gross profit of the quarter was NT$33,316 million; gross margin was 67.9 percent, an 18.9 percentage points improvement from that in the previous quarter. Operating income of the quarter was NT$30,111 million; operating margin was 61.3 percent; a 22.2 percentage points improvement from that in the last quarter. Non-operating income of the quarter was NT$1,607 million. The Company had net income of NT$26,058 million, with net margin of 53.1 percent. Earnings per share (EPS) was NT$8.41 (based on weighted average outstanding shares of 3,099 million). Book value per share was NT$62.25 at the quarter end. All numbers are unaudited.

DDR4 Prices Finally Cool With 5% Drop After 2,200% Surge

DDR4 pricing is finally showing signs of easing, as DDR4 16 Gb spot prices experienced a 5% correction in March after a more than 2,200% increase over the past year. The massive demand for AI data center expansion absorbed all available DDR production, making DDR4 and DDR5 pricing widely discussed topics among enthusiast communities. This has impacted PC DIY enthusiasts, laptop makers, PC OEMs, and everyone in between. Over the past year, the rapid price increase has effectively priced out many consumers from upgrading or installing new systems with larger RAM capacity. However, there are signs that the situation might improve as spot pricing has started to decrease.

First, readers need to understand the difference between spot and contract pricing in DDR memory. Contract pricing is what memory makers like Samsung, SK hynix, and Micron agree on with large buyers, such as PC OEMs like Apple, HP, or Dell, or even server makers who purchase DRAM in large quantities. On the other hand, spot pricing is an "on-the-spot" deal that provides immediate pricing without any contract. This spot pricing is typically reserved for smaller DRAM volumes and is usually bought by DRAM distributors and supply chain logistics. In the spot pricing market, DDR4 has fallen about 5% in March compared to February pricing, and the same applies to DDR5 memory spot pricing.

"GPUBreach" is a Rowhammer Attack for GDDR6-Based NVIDIA GPUs That Bypasses IOMMU

Late last week, we reported on a new series of rowhammer bit-flip attacks targeting GDDR6-based NVIDIA GPUs. Most of these attacks can be mitigated by enabling IOMMU through the BIOS, which restricts the memory regions the GPU can access on the host system, thereby closing the primary attack path. However, researchers from the University of Toronto have introduced "GPUBreach," which can bypass IOMMU and enable CPU-side privilege escalation, unlike the previous "GDDRHammer" and "GeForge" attacks. In most typical server, workstation, and even PC configurations, IOMMU restricts the GPU's access to the CPU's physical addresses, preventing direct memory access. These are the typical DMA-based attacks that the Input-Output Memory Management Unit protects users from. However, the new "GPUBreach" operates differently.

For example, "GPUBreach" exploits memory-safe bugs in the actual GPU driver and corrupts them. When IOMMU confines the GPU's direct memory access to driver-assigned buffers, the new exploit corrupts metadata within these permitted buffers. This causes the driver, which has kernel privileges enabled on the CPU host, to perform out-of-band writes to the buffer, effectively bypassing any protection IOMMU can offer. This logic is built into the kernel by default, as the GPU driver is one of the most trusted components of the operating system. Hence, IOMMU bypass is possible when the metadata is corrupted. Since "GPUBreach" grants an attacker full root privilege escalation, the attack differs significantly from previous rowhammer attacks.

Limited Capacity and Order Shifts Drive March Consumer DRAM Price Surge, Led by Sub-4Gb Products

Major suppliers are continuing to phase out production of mature products below DDR4, according to TrendForce's latest research on the memory industry. As supply tightens structurally, DRAM prices have already posted significant cumulative increases in recent months.

TrendForce forecasts that consumer DRAM contract prices will continue to rise by 45-50% QoQ in 2Q26 after taking into account ongoing supply reductions, order transfers, and the slower pace of capacity expansion among Taiwanese suppliers.

Leaker Claims PS6 Won't Be Delayed Because AMD Won't "Waste Resources" on Validation

As the previously leaked launch date of Sony's upcoming PlayStation 6 approaches, leaks and rumors abound, with many claiming that the upcoming gaming console will launch later than initially expected. Now, reputable leaker, KeplerL2, has taken to the NeoGAF forums to dispel some of the doom and gloom surrounding the launch date and potential delays of the PS6. The leaker's reasoning stems not from some insider information, but rather from a simple application of logic, asking a fellow commenter "What copium? You think AMD is gonna waste resources doing validation on something they think will get delayed?"

The reasoning seems to be that, based on information like prior leaks, that AMD has already been working on custom APUs for both the living room version and the handheld model of the PlayStation 6, and that AMD would not continue validation of those APUs if it thought there were supply constraints that would lead to a delay ahead of the console family's expected launch date. It's also possible that AMD and Sony signed the supply contracts for the Canis and Orion APUs before the current DRAM crisis was in full swing, effectively making a launch delay impossible or at least less likely. However, this would mean that the console makers would have a batch of hardware ready for launch followed by intermittent or delayed supply—at least as long as the DRAM shortage holds. There have also been rumors that Sony will be drastically increasing the price of the PS6 consoles compared to the PS5 generation, although this appears to be at least somewhat contingent on Microsoft's Xbox Helix pricing strategy.

New Rowhammer Attack Puts GDDR6-Powered NVIDIA GPUs at Risk

Rowhammer attacks exploit vulnerabilities in DRAM hardware by causing targeted bit-flips, allowing attackers to bypass memory isolation and gain control over a device. These attacks were initially focused on CPUs and their associated DDR memory, such as DDR4. However, recent research indicates that NVIDIA GPUs are also vulnerable due to the fragile nature of the GDDR6 memory they use, which directly compromises the CPU host. Two independent research teams have discovered ways to exploit this decades-old memory vulnerability against modern graphics hardware, with trouble extending beyond the GPU itself. The "GDDRHammer" and "GeForge" groups have each developed functional exploits that use Rowhammer bit-flips in NVIDIA GPUs with GDDR6 memory to gain complete control over the host CPU's memory. This attack can perform bit-flips on some NVIDIA GPU models, ranging from the "Ampere" to "Ada Lovelace" families of cards.

An attacker who succeeds in this can read and write anything stored in the machine's main memory. Both teams have also introduced new Rowhammer techniques specifically designed for GPU architecture, achieving a significantly higher rate of bit-flips on GDDR6 memory than previous methods. The critical step in both exploit chains involves targeting the GPU's memory allocator, using controlled bit-flips to corrupt the GPU's page tables. Once these page tables are compromised, the attacker gains arbitrary read and write access to CPU memory, breaking down the security boundary between the graphics subsystem and the rest of the machine. The end result is a full system compromise, as the attacker can manipulate memory at will and gain root access, achieving total control without interacting with privileged software paths. The affected GPUs include the GeForce RTX 3060, which experienced 1,171 bit-flips, and the RTX 6000 "Ada" GPU, which saw 202 bit-flips from the attack.

Steam Deck 2 Ditches Semi-Custom APU for Off-the-Shelf AMD Silicon, Eyes 2028 Launch

Valve's next-generation Steam Deck 2 handheld console is reportedly planned for release in 2028, with significant manufacturing changes expected for this sequel to the highly successful handheld gaming device. According to a well-known industry leaker, KeplerL2, posting in the NeoGAF community, Valve is targeting a 2028 refresh for the second-generation Steam Deck. However, the ongoing supply chain shortages of DRAM and NAND Flash could cause disruptions to these plans, potentially leading to delays. Interestingly, this period is when the shortages are expected to start easing, so the Steam Deck 2 could still be released on time, depending on Valve's sourcing capabilities.

One of the most significant procurement shifts for the Steam Deck 2 is Valve's choice of the computing base that will power the handheld. Instead of using a semi-custom AMD APU, Valve is expected to use an off-the-shelf AMD APU that won't require any custom tuning from AMD to meet Valve's needs. This is welcome news, as the latest Steam Machine showed that Valve's reliance on a semi-custom APU solution made the hardware "obsolete" quickly while the rest of the industry advanced. With any semi-custom solution, stockpiling silicon and waiting for DRAM/NAND modules to arrive puts pressure on Valve to ship a product that is significantly underpowered or too expensive. However, with an off-the-shelf solution, Valve could use the best available option at the time of shipping and optimize SteamOS around it.

SEMI Projects Double-Digit Growth in Global 300 mm Fab Equipment Spending for 2026 and 2027

Worldwide 300 mm fab equipment spending is expected to increase 18% to $133 billion in 2026 and 14% to $151 billion in 2027, SEMI reported today in its latest 300 mm Fab Outlook. This strong growth reflects surging AI chip demand for data centers and edge devices, as well as the growing commitment to semiconductor self-sufficiency across key regions through localized industrial ecosystems and supply chain restructuring. Looking further out, the report projects investment will continue to increase 3% to $155 billion in 2028 and another 11% to $172 billion in 2029, respectively.

"AI is resetting the scale of semiconductor manufacturing investment," said Ajit Manocha, President and CEO of SEMI. "With global 300 mm fab equipment spending projected to exceed $150 billion in 2027 for the first time, the industry is making historic, sustained commitments to the advanced capacity and resilient supply chains needed to power the AI era."

Raspberry Pi Announces More Price Hikes, 3 GB Raspberry Pi 4 SKU

One could be forgiven for thinking it's an April fools, but alas, Raspberry Pi has announced yet another price hike due to the increasing costs of DRAM. Its CEO, Eben Upton announced in a blog post that the company has seen a seven-fold increase in the cost of LPDDR4 DRAM, which is used in both the Raspberry Pi 4 and 5. All 4 GB and up SKUs of the aforementioned products will see a price hike that ranges from US$25 to US$100. Other products will also see an increase in price and you can find all the price bumps in the table below.

At the same time, the company is launching a new 3 GB SKU of the Raspberry Pi 4, which will launch at US$83.75. The new SKU is available today from all authorised resellers globally. The price increases mean that the 16 GB SKU of the Raspberry Pi 5 now comes in at US$305, which is more than what a lot of mini PCs set you back six months ago. The 16 GB Raspberry Pi 500+ keyboard computer comes in at a whopping US$410, suggesting that some products are unlikely to sell, as they've simply become uncompetitive. The only good news today is that the 1 and 2 GB SKUs for the Raspberry Pi 4 and 5 won't see any price hikes this time around, alongside the 4 GB SKU of the Raspberry Pi 400. Raspberry Pi is promising to lower its pricing as soon as the cost for DRAM goes down at some point in the future.

$700 PS6 Still Possible but Chances Are Slim with $800+ Xbox Incoming

Microsoft recently revealed that Xbox Project Helix would be its next-gen gaming console and that it would play both PC and Xbox games, however, previous leaks tipped a rather high price tag for the upcoming console generation—some expect it to be upwards of $800. While this may have its effects on Microsoft's sales, it also has bigger implications for the wider console and gaming hardware market itself. According to notorious hardware leaker, KeplerL2, on the NeoGAF forums, the reduced pressure from Microsoft may be enough for Sony to raise prices on the PS6. There have also been rumors that Sony is planning a PlayStation 6 Portable, which would be a standalone device and could theoretically fill the gap left by Sony in the more affordable console space if this price prediction is true.

The leaker explains that their "current BOM estimate for PS6 is ~$760, so I would say $699 is still possible with a reasonable subsidy. The question is if Sony will even bother now that Xbox is not direct competition anymore." These comments come at a time when hardware prices have skyrocketed, and availability is low, thanks to the ongoing DRAM crisis largely caused by increased demand from the AI industry. This bill of materials cost estimate also assumes that there will be no decrease in memory or hardware costs, which is currently an unknown, with all the talk about AI being a bubble. Those same hardware shortages and price increases have been the justification for predictions of console delays and numerous cancellations by PC hardware manufacturers. It also recently came to light that Sony will be scaling back its PC port efforts, meaning fewer Sony exclusive games will end up on PC, giving players more of an incentive to buy the PS6, even if prices are somewhat inflated.

DRAM Manufacturer Stock Prices Dip Over Google TurboQuant Announcement

Stock prices of DRAM manufacturers dipped by as much as 19% over the past 5 days, over the March 24 announcement of Google TurboQuant, a new technology that Google claims will reduce the memory footprint of AI models by a factor of 6, and improve inference speeds by a factor of 8. As of this writing, Micron Technology (NASDAQ: MU) dipped 19.5% over the last 5 days. Over in Korea, SK Hynix saw its stock price drop by 6%, while Samsung Electronics saw a dip by 5%.

TurboQuant is an advanced quantization algorithm developed by Google that delivers massive data compression for LLMs and vector search engines. It effectively tackles memory bottlenecks in the key-value cache and accelerates similarity lookups without sacrificing model accuracy. TurboQuant achieves this efficiency by combining two novel techniques: PolarQuant, which simplifies data geometry using polar coordinates to eliminate traditional memory overhead, and Quantized Johnson-Lindenstrauss (QJL), a 1-bit mathematical error-checker. Capable of compressing the key-value cache to just 3 bits without requiring fine-tuning, TurboQuant enables up to 8x faster runtimes on GPUs, establishing a new standard for AI efficiency.

AMD Joins Intel in Raising PC CPU Prices by Up to 15%

Last week, we reported that Intel is preparing to increase CPU prices by 10% across its client PC sector. However, a new report from Nikkei Asia suggests that AMD is also joining this trend, with plans for a PC CPU price hike as well. Reportedly, AMD Ryzen CPUs could see prices rise by 15% compared to the same time last year, when prices were typically around the MSRP at retailers. Now, as CPU demand has depleted inventories and the focus remains on server and data center CPU production, capacity for the client segment has been significantly reduced, leading to little to no inventory for PC enthusiasts. Large OEMs like HP and Dell are among the first to feel the pressure from the dwindling supply chain and have reported a significant gap between demand and supply for their PC systems.

Nikkei also notes that both AMD and Intel have informed their clients that CPU price increases will take effect by the end of March and into April, which should start to manifest very soon. What used to be a one or two-week wait from order to CPU shipment has now stretched to a process lasting eight to twelve weeks. This means that a CPU batch ordered in April might not arrive until June. This period is expected to be the worst in terms of supply in the second quarter of this year. Even if OEMs are willing to pay extra to secure CPU supply, availability is lacking. The CPU shortage is worsening daily, coinciding with the ongoing memory and storage shortage we are already experiencing.

ASUS Plans 30% PC Price Increase in Taiwan, Other OEMs to Follow

PC pricing in Taiwan may see a significant increase next quarter, as ASUS Joint Technology Systems Division General Manager Yi-Hsiang Liao has announced a planned 30% price hike across the company's entire product line. He explains that the extremely high costs of DRAM and SSD storage, combined with a shortage of CPUs, are driving this increase. ASUS also claims that this issue is not limited to their company, as every Taiwanese PC maker will face similar challenges. Reportedly, ASUS did not comment on whether the price increase will affect overseas markets or remain exclusive to Taiwan. However, it seems likely that rising component costs in Taiwan will also impact Western markets, which have already experienced significant price increases in recent months.
UDN, Machine TranslatedYesterday, ASUS, in partnership with Qualcomm, held a press conference for its new Zenbook A16 laptop. During an interview, Liao Yi-hsiang, General Manager of ASUS United Technology Systems Business, revealed that ASUS has confirmed that PC prices in Taiwan will increase by 25% to 30% or more in the second quarter, with varying increases across different models.

Silicon Power Launches Enterprise-Grade DDR5 RDIMM for AI Workloads

Silicon Power (SP) announces the launch of its latest DDR5 RDIMM module, purpose-built to meet the growing demands of enterprise data centers and AI-driven computing environments. Designed with original high-quality DRAM chips, the new module delivers massive bandwidth and enhanced reliability to support intensive workloads such as artificial intelligence, machine learning, and large-scale data processing. Leveraging a high-density architecture with 32 internal banks across 8 groups, the DDR5 RDIMM maximizes throughput to unlock next-generation server performance. With speeds of up to 6400 MT/s, it empowers enterprises to accelerate data pipelines and fully utilize modern server architectures.

Advanced Reliability, Broad Compatibility, and Power Efficiency
Engineered for uncompromising stability, Silicon Power's DDR5 RDIMM integrates advanced On-Die ECC technology alongside a Registering Clock Driver (RCD), significantly enhancing fault tolerance compared to standard ECC UDIMMs. This robust design ensures superior data integrity, making it ideal for mission-critical enterprise applications that require continuous uptime.

SK Group Warns Memory Shortage May Continue into 2030

Earlier this week we reported that the memory shortage was going to persist until late 2028, but news out of Korea now suggests it might stick around all the way until 2030. SK Group Chairman Chey Tae-won is quoted by The Korea Times saying that "The shortage stems from a lack of wafer capacity, and securing additional wafers takes at least four to five years," continuing "We expect the industry-wide supply shortfall to persist at over 20 percent through 2030."

The company is apparently looking at ways to stabilise pricing, but as to when this will happen, is anyone's guess at this point in time. In this specific case, it's down to SK hynix CEO Kwak Noh-jung to try and resolve the immediate situation. SK Group doesn't seem interested in building fabs outside of South Korea either, as Chey also told The Korea Times that "Korea already has the infrastructure in place, allowing for a much faster response. That is why we are concentrating our efforts here." There is at least some good news here, as it doesn't seem like SK hynix will put its entire focus on HBM memory, as the company is aware that might lead to further shortages of DRAM, which will affect the broader tech industry.

Silicon Motion Showcases Enterprise SSD Controllers and PCIe NVMe Boot Drive Solutions at GTC 2026

Silicon Motion Technology Corporation, a global leader in designing and marketing NAND flash controllers for solid-state storage devices, today announced that it will showcase a rich portfolio of differentiated enterprise SSD controllers and PCIe NVMe BGA boot SSD at NVIDIA GTC 2026, Booth #3015, purpose-built to meet the evolving requirements of the NVIDIA AI ecosystem. As AI models scale, inference architectures are extending beyond HBM and System DRAM into high-performance NAND storage tiers, as reflected in NVIDIA's ICMS initiative. In this new architecture, NAND-based Storage becomes a performance-critical layer that requires deterministic latency and quality-of-service differentiation.

Silicon Motion delivers a vertically integrated storage solution encompassing advanced SSD controller design, full firmware development, and compact Reference Design Kits (RDKs) aligned with leading enterprise form factors such as E1.S, E1.L, E3.S, E3.L, and U.2 for AI server deployments. The company also provides enterprise PCIe NVMe BGA boot SSD with strong endurance and long-term operational stability, deployed in AI systems.

Micron Completes Acquisition of PSMC's Tongluo P5 Site in Taiwan

Micron Technology, Inc. (Nasdaq: MU) today announced it has completed the acquisition and assumed ownership of Powerchip Semiconductor Manufacturing Corporation's (PSMC) P5 site in Tongluo, Miaoli County, Taiwan, under the acquisition agreement previously announced on January 17, 2026.

The new site will complement Micron's existing operations in Taiwan as an extension of the company's vertically integrated mega campus in Taichung, located approximately 15 miles away. The site includes approximately 300,000 square feet of existing 300 mm cleanroom space and will support Micron's efforts to expand supply of leading-edge DRAM products, including HBM, to meet growing AI-driven demand.

Framework Increases RAM and Pre-Built Laptop and Desktop Pricing in Light of Ongoing DRAM Crisis

Framework has taken a remarkably transparent approach to recent RAM price increases that affect the pricing of both its laptops and its standalone RAM sales, sticking to monthly price updates throughout the ongoing RAM shortage and maintaining a blog post with monthly updates on the industry situation. Framework's March memory pricing update will see prices on DDR5 SODIMMs increase to as much as $13-18 per GB, with lower capacity sticks seemingly trending towards the higher end of that price bracket. The price increases in question have also affected the Framework Desktop and some pre-built SKUs of the Framework Laptop 16.

Framework also confirmed that it has "started to deplete" its stockpile of low-cost SSDs that were sitting in inventory, and the company predicts that prices for the Laptop 12, 13, and 16 will continue to trend upwards in the coming months as a result of both the storage and RAM price increases. For the time being, the OEM still has supply of 2, 4, and 8 TB SN850X SSDs that are priced below market averages. The impacts of the DRAM crisis on silicon fabrication have also begun to become apparent, since the Intel Core i5-1334U in the Framework 12 is in limited supply.

Applied Materials and Micron Partner to Accelerate HBM, NAND and DRAM Development

Applied Materials, Inc. today announced it is working with Micron Technology to develop next-generation DRAM, high-bandwidth memory (HBM) and NAND solutions that increase the energy-efficient performance of AI systems, bringing together advanced R&D capabilities from Applied's EPIC Center in Silicon Valley and Micron's state-of-the-art innovation center in Boise, Idaho to strengthen the semiconductor innovation pipeline in the United States.

"Applied Materials and Micron have a long-standing partnership focused on driving higher performance and more energy-efficient advanced memory chips by pushing the boundaries of materials engineering and manufacturing innovation," said Gary Dickerson, President and CEO of Applied Materials. "We are excited to deepen our collaboration with Micron as a founding partner at the EPIC Center as next-generation memory technologies play an increasingly vital role in the future of AI systems."

Rising Memory and CPU Prices Could Push Mainstream Notebook Prices Up by Nearly 40 Percent

The global notebook market is expected to face dual pressures from weak demand and rising component costs in 2026, according to TrendForce's latest research on the notebook industry. In addition to rapidly rising memory prices, CPU pricing has also begun to move higher. TrendForce estimates that to preserve existing margin structures for both notebook brands and distribution channels, the retail price of a mainstream notebook with an original MSRP of US$900 could rise by nearly 40%.

TrendForce notes that since the start of 2026, supply for notebook DRAM and NAND Flash has tightened significantly. Prices have surged, and shortages of certain components have become more pronounced, increasing uncertainty for notebook brands as they plan their procurement strategies.

Memory Makers Shift to Hourly Contracts as AI Demand Continues to Climb

The memory procurement market has adopted a new business model with hourly contracts, where quoted prices are valid for only a single hour, necessitating a new pricing quote with each change. Memory makers like SK hynix, Samsung, and Micron are responding to the massive demand for their memory solutions with new types of contracts that force OEMs to make quick decisions to procure DRAM within a very short timeframe. This means that memory makers are requiring much faster contract settlements, as the rapid increase in demand is causing product pricing to change literally by the hour. For example, large PC OEMs, who are among the biggest customers, now have to ship PCs with one pricing, while their future products are subject to price changes that fluctuate by the hour. How sustainable and stable this market will be remains to be seen.

Interestingly, the customer DRAM market is splitting into two camps. A short list of deep-pocketed customers, including large cloud providers, major automakers, and top smartphone firms such as Apple and Samsung Electronics, retain priority access to DRAM and the best pricing negotiation leverage. Memory manufacturers like SK hynix and Micron are said to prioritize these relationships above all else by favoring buyers who can prepay or settle in cash. For the vast remainder, more than 190,000 small and medium enterprises, the situation is harsher. Many lack the cash flow and bargaining leverage to accept rapid price jumps. As costs climb, some firms are revising demand forecasts downward to avoid margin erosion. Demand outside of the hyperscaler/data center sector may be revisited downward for many companies, as consumers are less keen on spending more on products that are becoming more expensive each day.

NVIDIA Lowers HBM4 Specs for "Vera Rubin" VR200 as Memory Suppliers Miss 22 TB/s Target

NVIDIA has reportedly lowered its performance requirements for the HBM4 memory used in "Rubin" GPUs, as SK hynix and Samsung are reportedly struggling to meet the ambitious performance targets set by NVIDIA. According to a new note from SemiAnalysis, NVIDIA is reducing its specification requirements for the upcoming GPU generation. Originally, NVIDIA targeted a total bandwidth of 22 TB/s for the Rubin chip, but memory suppliers seem to be having difficulty meeting these requirements. Initial shipments are expected to achieve closer to 20 TB/s, which translates to approximately 10 Gbps per pin for HBM4. This indicates that NVIDIA's aggressive upgrade plan for "Vera Rubin" is facing a setback, and the final performance will differ slightly.

Interestingly, NVIDIA's initial target for the "Vera Rubin" VR200 NVL72 system was 13 TB/s in March 2025, which was later upgraded to 20.5 TB/s by September. At CES 2026, NVIDIA confirmed that the VR200 NVL72 system is now operating at 22 TB/s of bandwidth. Compared to AMD's Instinct MI455X accelerator, which has 19.6 TB/s, NVIDIA initially had lower system bandwidth. They addressed this by using faster DRAM and improving interconnects between CPUs, GPUs, and the entire system. However, as memory makers like SK hynix and Samsung struggle to meet NVIDIA's performance requirements, we will see HBM4 speeds of about 20 TB/s for the entire "Vera Rubin" system.

Entry-Level PC Segment Might Disappear by 2028, Claims Gartner

Rising memory and storage costs are pricing entry-level PC buyers out of the market, which may disappear entirely. According to the analyst firm Gartner, the sub-$500 PC sector might vanish by 2028. Their analysis indicates that memory, which used to be just a small part of the total bill of materials (BOM) at 16% of the total PC cost in 2025, is expected to rise to nearly a quarter of the PC's cost at 23%, making the entry-level PC segment unsustainable. "This sharp increase removes vendors' ability to absorb costs, making low-margin entry-level laptops nonviable. Ultimately, we expect the sub-$500 entry-level PC segment will disappear by 2028," said Ranjit Atwal, Senior Director Analyst at Gartner. He added, "In addition, rising AI PC prices will delay the projected 50% market penetration of AI PCs until 2028."

We have witnessed multiple price increases across many PC components such as DRAM, NAND Flash, and GPUs. With manufacturers unable to produce PCs at any tangible profit levels in the sub-$500 PC sector, it might entirely disappear from the mainstream PC market. The concept of budget builds might become obsolete, with the majority of PCs ending up in categories above that threshold, near or beyond four figures. Gartner estimates that there will be about a 130% increase in combined DRAM and NAND Flash pricing by the end of this year, increasing PC prices by about 17% compared to 2025 levels. This situation will push consumer and enterprise demand toward premium PCs.

Micron Celebrates Opening of India's First Semiconductor Assembly and Test Facility

Micron Technology, Inc. celebrated the grand opening of its semiconductor assembly and test facility in Sanand, Gujarat, India. The state-of-the-art facility converts advanced DRAM and NAND wafers from Micron's global manufacturing network into finished memory and storage products. Once fully ramped, the first phase of Micron's Sanand operation will feature more than 500,000 square feet of cleanroom space, making it one of the world's largest single-floor assembly and test cleanrooms. The site serves customers worldwide to meet the growing global demand for memory and storage fueled by AI.

The facility represents a combined investment of approximately $2.75 billion by Micron and its government partners, advancing semiconductor manufacturing capabilities in India. Micron Chairman, President and CEO Sanjay Mehrotra and other executives witnessed the opening ceremony with Prime Minister Narendra Modi, Chief Minister of Gujarat Bhupendra Patel, Union Minister for Railways, Communications, Electronics & IT Ashwini Vaishnaw, U.S. Ambassador to India Sergio Gor and other distinguished government officials and guests.
Return to Keyword Browsing
Nov 16th, 2026 15:35 CST change timezone

New Forum Posts

Popular Reviews

TPU on YouTube

Controversial News Posts