Monday, August 25th 2025

Intel Details "Clearwater Forest" Xeon with 288 E-Cores on 18A Process

Intel used Hot Chips to pull back the curtain on "Clearwater Forest", its next-generation E-core Xeon. The company has paired major architectural upgrades with its newest 18A process and advanced 3D Foveros packaging paired with EMIB. The chip replaces "Sierra Forest" and is built around the new "Darkmont" efficiency cores. Intel says Clearwater Forest will ship in a massive chiplet package using the 18A node for the compute pieces while relying on Foveros Direct 3D for stacking. The company is pitching this design as a showcase of what its foundry and packaging teams can now deliver.

Under the hood, the Darkmont E-core leans heavily on a wider, more parallel front end and a beefed-up out-of-order engine. Intel disclosed a 64 KB instruction cache per core and an expanded decoder that can handle more instructions per cycle than the previous "Crestmont" E-core design. Reorder and allocation structures have evolved, allocation units have been increased, and the out-of-order window has been enlarged to accommodate more in-flight work. Execution resources were also multiplied, with many more execution ports for integer and vector math, allowing the cores to sustain much higher parallel throughput.
The physical design is striking. In its largest configuration, Clearwater Forest stacks 12 compute chiplets built on Intel 18A above three base tiles made on Intel 3, and there are two I/O tiles on Intel 7 at the package's extremes. Compute clusters remain organized as four-core groups sharing 4 MB of L2, and a fast on-chip fabric ties clusters together. Intel highlighted a very large last-level cache housed in the base tiles and emphasized the use of EMIB alongside Foveros to link the heterogeneous pieces, producing a package with many active dies that calls to mind the company's recent high-density designs.
On the platform side the chips keep server continuity in mind. Clearwater Forest is said to be compatible with the current Xeon 69xxE/P platform, allowing existing servers to be reused while maintaining 12 memory channels and broad PCIe and CXL support. Memory speed is stepping up toward DDR5-8000 and Intel floated system figures such as up to 288 cores per socket, a two-socket ceiling approaching 576 cores, and more than 1,152 MB of combined last-level cache across the package.
Sources: Intel at Hot Chips, via Wccftech
Add your own comment

47 Comments on Intel Details "Clearwater Forest" Xeon with 288 E-Cores on 18A Process

#26
kondamin
RandallFlaggNobody is going to make 250mm^2 dies for servers anymore. Including and especially AMD. The last big dies we are likely to see will be some laptop AMD APUs on N4 (nm) and Intel's Raptor Lake or Bartlett Lake if that is released, both on Intel 7.

Tiled cores are the affordable option on increasingly expensive nodes. Nobody will be making tiles > 100mm^2. GPUs are next.
I think power will remain big, given their low volume and target market
Posted on Reply
#27
AleksandarK
News Editor
igormp@AleksandarK, it seems that Clearwater forest is actually using skymont, and not darkmont, that explains why I thought it was so similar. At least according do C&C:
chipsandcheese.com/p/intels-clearwater-forest-e-core-server

Would you be able to double check the actual underlying μarch?
It could very well be that darkmont is just a minor refresh of skymont as well.
Yes it is indeed Darkmont. Minor uarch revision but 17% IPC bump, the magic of old Intel is back!
Posted on Reply
#28
londiste
overclockedamdSure, chiplets improve wafer yield versus trying to fab a giant monolithic die — no argument there. But let’s not pretend packaging is magic. When you’re stacking and stitching together 20+ different tiles with Foveros + EMIB, every interconnect, bump, and bond has to pass. One bad link and the whole package is scrap. That’s a yield hit too, just at the assembly stage instead of the wafer stage. So yeah, the package itself doesn’t make silicon yields worse, but the more complex the build, the more chances you’ve got to lose units on the back end.
I still bet this is order(s) of magnitude easier than significantly bigger dies.
Posted on Reply
#29
Vayra86
Somehow, I still feel like we're looking at smoke and mirrors, and not a truly competitive chip here.
Posted on Reply
#30
N/A
Imagine what a desktop Titan Lake core would look like, 4 x24 cores with 576 MB L3 underneath.
Posted on Reply
#31
Tek-Check
dir_dNot to mention it being on the same platform Intel has been on for a while which really cuts down on TCO. This will stop many companies from moving to an AMD platform.
It's not the case that many companies have purchased Xeon6 Granite Rapids platform in the first place.
Posted on Reply
#32
Easo
As far as I am concerned this is technologically impressive. Give credit where credit is due.
Posted on Reply
#33
dyonoctis
Vayra86Somehow, I still feel like we're looking at smoke and mirrors, and not a truly competitive chip here.
I thought about it today: what if Intel is just waiting for the e-cores to become just as good as a P-core when it comes to IPC and frequency? But instead of fumbling around in a Lab for who knows how many years until it's ready to market, the hybrid approach allows them to sell a CPU that can still put up a fight (way better than Bulldozer did for AMD, both the CPU and the platform became painfully weak and ancient until zen)
Posted on Reply
#34
Nathaaab
phanbueyi hope the all e-core thing makes it to the desktop and prosumer space... having played a bit with the e cores on arrow lake, those are no joke a - 48 core e core desktop CPU would be a monster.
We do know that eventually they will switch back to the unified core architecture, and even Nova Lake is supposedly getting a massive core count boost
Posted on Reply
#35
lemans24
NathaaabWe do know that eventually they will switch back to the unified core architecture, and even Nova Lake is supposedly getting a massive core count boost
Yes, I see this Clearwater e-core as a really good future for Nova Lake as Arctic Core e-cores should have better ipc and AVX 10.2 with full AVX-512 instruction set and APX built in too.
Arctic Wolf definitely seems to be a forerunner of the eventual move to Unified Core. Hopefully, Intel will still be in business by then!!
Posted on Reply
#36
RandallFlagg
If you take 15 minutes to look into this chip, it's actually very impressive. Next level stuff.

2-socket systems with 576 e-cores (up from 288 with Sierra Forest). 15% claimed IPC bump over previous gen. 12 DDR5-8000 channels for 1.3TB/s bandwidth for each CPU (+30% vs Sierra Forest). L2 cache bandwidth doubled from that of Sierra Forest (200MB/s -> 400MB/s).

If it's able to keep those cores fed, and Intel can produce enough of them, it's going to put a big damper on the latest AMD server chips.
Posted on Reply
#37
Squared
igormp@AleksandarK, it seems that Clearwater forest is actually using skymont, and not darkmont, that explains why I thought it was so similar. At least according do C&C:
chipsandcheese.com/p/intels-clearwater-forest-e-core-server

Would you be able to double check the actual underlying μarch?
It could very well be that darkmont is just a minor refresh of skymont as well.
For what it's worth, when Skymont came out the news was it was also coming to Clearwater Forest, then Clearwater Forest news talked about Darkmont, except for Chips & Cheese as you linked. This article says Darkmont but compares it to Crestmont as if it were talking about Skymont. A minor refresh would explain all of this.

Crestmont in Sierra Forest came out just six months after Crestmon in Meteor Lake, both on similar nodes. Skymont on Lunar Lake/Arrow Lake and Darkmont on Clearwater Forest are a little more removed in time and on very different nodes, so whatever Clearwater Forest is using certainly has some changes from the Skymont cores made on TSMC N3B.

Name changes like this are common too. Cypress Cove and Willow Cove were minor refreshes of Sunny Cove, and Raptor Cove and Redwood Cove were minor refreshes of Golden Cove.
Posted on Reply
#38
kondamin
Vayra86Somehow, I still feel like we're looking at smoke and mirrors, and not a truly competitive chip here.
it is a chip that has a known market and depending on the energy use it might be really good for those looking for it.
SMT isn't that interesting for cloud providers as it poses a security risk, neither is raw performance.

So yeah, i hope intel manages to makes a boat load of them at a competitive price.
Maybe i'll get a boost in the number of v cores on my hosting plan if that happens.
Posted on Reply
#39
overclockedamd
I still think the Achilles heel is manufacturing. Even if the chiplets are small, you’re still talking about 12 compute + 3 base + 2 I/O stitched together with Foveros and EMIB. That’s a complex beast, and if 18A yields really are struggling, Clearwater’s scale could make package-level scrap painful.

On the consumer side the rumors are just as wild — Nova Lake desktops supposedly hitting 52 cores (16P + 32E + 4 LP-E) on 18A/N2 hybrid tiles. That’s a far more manageable setup: 1–2 compute tiles + 1 base + 1 I/O, especially if some work is offloaded to TSMC as rumored. On paper it’s a monster, but again, execution is everything.

That said, I want 18A and the nodes that follow to succeed. The industry badly needs Intel firing on all cylinders again. Healthy competition keeps AMD, Intel, and everyone else pushing harder — and we all benefit from that.
Posted on Reply
#40
Flanker
Huh reminds me of Xeon Phi
Posted on Reply
#41
igormp
SquaredName changes like this are common too. Cypress Cove and Willow Cove were minor refreshes of Sunny Cove, and Raptor Cove and Redwood Cove were minor refreshes of Golden Cove
Yeah, that's a perfect example if that's the case.
Posted on Reply
#42
kondamin
overclockedamdI still think the Achilles heel is manufacturing. Even if the chiplets are small, you’re still talking about 12 compute + 3 base + 2 I/O stitched together with Foveros and EMIB. That’s a complex beast, and if 18A yields really are struggling, Clearwater’s scale could make package-level scrap painful.

On the consumer side the rumors are just as wild — Nova Lake desktops supposedly hitting 52 cores (16P + 32E + 4 LP-E) on 18A/N2 hybrid tiles. That’s a far more manageable setup: 1–2 compute tiles + 1 base + 1 I/O, especially if some work is offloaded to TSMC as rumored. On paper it’s a monster, but again, execution is everything.

That said, I want 18A and the nodes that follow to succeed. The industry badly needs Intel firing on all cylinders again. Healthy competition keeps AMD, Intel, and everyone else pushing harder — and we all benefit from that.
is intel still having as many issues with their foveros technology?
I just asked gemini, which brings up issues they had 5 years ago.
But it seems even arrow lake doesn't suffer as much from the initial issues stacking those dies have.
I can order a gen 2 core ultra and have it tomorrow, i highly doubt this would be so if they had that many problems.

I mean, nand manufacturers are stacking hundreds of layers on top of each other without discernable issues.

I think those rumours are old and mostly FUD
Posted on Reply
#43
londiste
What issues did Intel have with Foveros? IIRC that was never a serious issue for them - and it hasn't been used all that much in CPUs either. Their packaging solutions were and still seem to be on the cutting edge of things.

NAND Flash layers are something completely different, nothing to do with packaging (Yes, they now are starting to "glue" together a few dies but that is beyond the general xxx-layer NAND).
Posted on Reply
#44
overclockedamd
Foveros isn’t NAND stacking—NAND is vertical layers of memory, and if some cells fail, ECC or spare blocks cover it. EMIB/Foveros is stitching active dies together with lateral and vertical interconnects where every link has to be perfect, because one bad bump or trace kills the whole package. Arrow Lake shows Intel has improved, but Clearwater’s 12 compute + 3 base + 2 I/O tiles is another level of risk. That’s exactly my point—given Intel’s recent track record, I’m saying prove me wrong, Intel.

Edit: Arrow Lake is comparatively simple — 3 main tiles (compute, graphics, base/SoC) versus Clearwater’s 17 (12 compute + 3 base + 2 I/O). Big difference in complexity.
Posted on Reply
#45
igormp
overclockedamdFoveros isn’t NAND stacking—NAND is vertical layers of memory, and if some cells fail, ECC or spare blocks cover it. EMIB/Foveros is stitching active dies together with lateral and vertical interconnects where every link has to be perfect, because one bad bump or trace kills the whole package. Arrow Lake shows Intel has improved, but Clearwater’s 12 compute + 3 base + 2 I/O tiles is another level of risk. That’s exactly my point—given Intel’s recent track record, I’m saying prove me wrong, Intel.

Edit: Arrow Lake is comparatively simple — 3 main tiles (compute, graphics, base/SoC) versus Clearwater’s 17 (12 compute + 3 base + 2 I/O). Big difference in complexity.
But Intel already has granite rapids, which is 2x compute tiles + 2x IO tiles on top of their EMIB interposer, and this has been in full production and already found in the wild in many places.
Clearwater forest is more complex due to the extra layer of base tile + compute tiles on top of it, but the technology itself apparently seems to be working fine.
Posted on Reply
#46
overclockedamd
igormpBut Intel already has granite rapids, which is 2x compute tiles + 2x IO tiles on top of their EMIB interposer, and this has been in full production and already found in the wild in many places.
Clearwater forest is more complex due to the extra layer of base tile + compute tiles on top of it, but the technology itself apparently seems to be working fine.
Granite Rapids proves EMIB tiling works — 4 active tiles total (2 compute + 2 I/O) on an interposer is no small feat. But Clearwater is a different class of problem: now you’re adding a base layer, then stacking 12 compute dies on top, all stitched together with both Foveros and EMIB — and unlike Granite Rapids, it’s a split-fab job with some tiles on Intel 18A and others coming from TSMC. That’s far more moving parts, and every new layer of complexity is another chance for yield or assembly to bite back. I’m not saying Intel can’t do it — just that they still have to prove they can scale it this far without the wheels coming off.
Posted on Reply
#47
igormp
overclockedamdand unlike Granite Rapids, it’s a split-fab job with some tiles on Intel 18A and others coming from TSMC.
How so? If you look again at the OP, it's Intel 3 for the base chiplet, Intel 18A for the CPU chiplets, and Intel 7 for the IO chiplets.
Granite rapids was Intel 3 for the compute tile and Intel 7 for the IO tile already (which is the same one used here).
overclockedamdThat’s far more moving parts, and every new layer of complexity is another chance for yield or assembly to bite back.
Yeah, I agree, but my point is that it's not a first run of such stacking strategy, so this process should be way more mature at this point in time.
Posted on Reply
Add your own comment
Nov 26th, 2026 21:41 CST change timezone

New Forum Posts

Popular Reviews

TPU on YouTube

Controversial News Posts