Monday, August 25th 2025
Intel Details "Clearwater Forest" Xeon with 288 E-Cores on 18A Process
Intel used Hot Chips to pull back the curtain on "Clearwater Forest", its next-generation E-core Xeon. The company has paired major architectural upgrades with its newest 18A process and advanced 3D Foveros packaging paired with EMIB. The chip replaces "Sierra Forest" and is built around the new "Darkmont" efficiency cores. Intel says Clearwater Forest will ship in a massive chiplet package using the 18A node for the compute pieces while relying on Foveros Direct 3D for stacking. The company is pitching this design as a showcase of what its foundry and packaging teams can now deliver.
Under the hood, the Darkmont E-core leans heavily on a wider, more parallel front end and a beefed-up out-of-order engine. Intel disclosed a 64 KB instruction cache per core and an expanded decoder that can handle more instructions per cycle than the previous "Crestmont" E-core design. Reorder and allocation structures have evolved, allocation units have been increased, and the out-of-order window has been enlarged to accommodate more in-flight work. Execution resources were also multiplied, with many more execution ports for integer and vector math, allowing the cores to sustain much higher parallel throughput.The physical design is striking. In its largest configuration, Clearwater Forest stacks 12 compute chiplets built on Intel 18A above three base tiles made on Intel 3, and there are two I/O tiles on Intel 7 at the package's extremes. Compute clusters remain organized as four-core groups sharing 4 MB of L2, and a fast on-chip fabric ties clusters together. Intel highlighted a very large last-level cache housed in the base tiles and emphasized the use of EMIB alongside Foveros to link the heterogeneous pieces, producing a package with many active dies that calls to mind the company's recent high-density designs.On the platform side the chips keep server continuity in mind. Clearwater Forest is said to be compatible with the current Xeon 69xxE/P platform, allowing existing servers to be reused while maintaining 12 memory channels and broad PCIe and CXL support. Memory speed is stepping up toward DDR5-8000 and Intel floated system figures such as up to 288 cores per socket, a two-socket ceiling approaching 576 cores, and more than 1,152 MB of combined last-level cache across the package.
Sources:
Intel at Hot Chips, via Wccftech
Under the hood, the Darkmont E-core leans heavily on a wider, more parallel front end and a beefed-up out-of-order engine. Intel disclosed a 64 KB instruction cache per core and an expanded decoder that can handle more instructions per cycle than the previous "Crestmont" E-core design. Reorder and allocation structures have evolved, allocation units have been increased, and the out-of-order window has been enlarged to accommodate more in-flight work. Execution resources were also multiplied, with many more execution ports for integer and vector math, allowing the cores to sustain much higher parallel throughput.The physical design is striking. In its largest configuration, Clearwater Forest stacks 12 compute chiplets built on Intel 18A above three base tiles made on Intel 3, and there are two I/O tiles on Intel 7 at the package's extremes. Compute clusters remain organized as four-core groups sharing 4 MB of L2, and a fast on-chip fabric ties clusters together. Intel highlighted a very large last-level cache housed in the base tiles and emphasized the use of EMIB alongside Foveros to link the heterogeneous pieces, producing a package with many active dies that calls to mind the company's recent high-density designs.On the platform side the chips keep server continuity in mind. Clearwater Forest is said to be compatible with the current Xeon 69xxE/P platform, allowing existing servers to be reused while maintaining 12 memory channels and broad PCIe and CXL support. Memory speed is stepping up toward DDR5-8000 and Intel floated system figures such as up to 288 cores per socket, a two-socket ceiling approaching 576 cores, and more than 1,152 MB of combined last-level cache across the package.










47 Comments on Intel Details "Clearwater Forest" Xeon with 288 E-Cores on 18A Process
So yeah, 18A works, but it’s bleeding money. Until they’re north of 60–70% they can’t play in the same league as TSMC. This node is either Intel’s redemption arc or another Cannon Lake-tier faceplant. Time will sort it out.
Darkmont so far seems to be a minor update over Skymont, given that it also has an 8-wide rename/dispatch, with the exact same 416 entries for its ROB. The L1 and L2 caches also seems to be the exact same. From the images, I assume it'll still use the same 3x 3-wide decoders.
IIRC, Skymont had 25 execution ports, vs the claimed 26 for Darkmont, so a minor bump in this regard.
From their 3D construction slide, given that it's a 288-core CPU, we can assume that it has 96 cores per base tile (288/3), with 24 cores per chiplet (96/3 or 288/12), so 6x E-core clusters per CPU chiplet.
All in all, it's a really nice upgrade over the previous Sierra Forest (with Crestmont E-cores), both in the new core µarch, as well as the chiplet fab strategy, but a minor performance bump compared to Skymont.How is it giant? Those should be on the smaller. It'd be somewhat similar to an Intel CPU with only 6 P-cores, so less than half the size of arrow lake's compute tile. Given its current 114.5mm², it'd be ~57,25mm² on TSMC's N3B, and given how Intel's 18A supposedly has 20% higher density, it should land at around 46mm².
That's already smaller than Bergamo's 16c Zen4c CCDs at 72.7mm². It'd be nice to compare those numbers with Turin dense one's, since those are using TSMC's 3nm fab process, but I could not find such numbers.
So yeah, Darkmont tiles are compact, but Clearwater Forest as a finished CPU is basically a yield Jenga tower. Intel can show it off, but scaling it in volume is another story.
Like 20 N100's stuck together into one expensive heating element. So i can convert a billion flacs at the same time...
The IO tiles are the exact same as the ones from Granite Rapids, which are already in production and widely deployed, so re-using those is always a good strategy. Those are also glued with EMIB and Forevos, so nothing new. Yields for Intel 7 should not be an issue, so I'd say that the IO tile are a non-issue.
The compute tiles are small, so even if yields are not great, for such small dies it should not be that awful.
The base tile is where things get interesting. No idea on how well Intel 3 is doing, but it does have the Granite Rapids, Sierra Forest and Arrow Lake-U (the meteor lake refresh) products being built on it, so it shouldn't be that bad. I'm going on the assumption that such base tile should be actually smaller than a compute tile from Granite Rapids (>500mm²), while also being way simpler. Same goes for Sierra Forest 144 E-core tile, which is also closer to 600mm².
Ofc it is not as efficient as to what AMD currently has, with a bunch of small CCDs and just a single IOD, but this strategy of small tiles with cores + base tile + IO tiles is way better than their current gigantic compute tiles with 100+ cores.
"Yield" all by itself is completely meaningless. Defects per cm^2 is the only thing that really matters.
i.e., a 0.5 defect / cm2 with a 57mm2 die has a 75.2% yield - meaning you get to use 75.2% of the wafer:
While a 0.5 defect / cm2 to a 200mm2 die has a 36.8% yield - meaning 63.2% of the wafer is throw-away :
Yields are okay!
And that would be at 18A, vs its current TSMC N4 ("5 nm") node, and assuming they have not improved yield in the past 9 months.
The survival of Intel Foundries depends on them being good enough for customers, not just as a subsidiary to Intel's Product Groups (this is a mindset 5 years out-of-date).
Cutting edge nodes like 18a are extremely expensive, and if it can't manufacture extremely expensive products (at minimum 80% yield on 250mm^2 dies) it won't meaningfully attract customers. Intel Foundries desperately need high volume customers.
The fact that Intel will manufacture Clearwater Forest on both TSMC 3nm and 18a, and is thinking about focusing on 14a before 18a is finished should tell you everything.
Tiled cores are the affordable option on increasingly expensive nodes. Nobody will be making tiles > 100mm^2. GPUs are next.
chipsandcheese.com/p/intels-clearwater-forest-e-core-server
Would you be able to double check the actual underlying μarch?
It could very well be that darkmont is just a minor refresh of skymont as well.